Oil and Gas at Your Door? (2005 Edition) - Earthworks
Oil and Gas at Your Door? (2005 Edition) - Earthworks
Oil and Gas at Your Door? (2005 Edition) - Earthworks
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STAGES OF OIL & GAS DEVELOPMENT<br />
Plugging Wells<br />
Before a company permanently leaves a well site, the well should be plugged or capped. The<br />
purpose of plugging is to prevent form<strong>at</strong>ion w<strong>at</strong>er from migr<strong>at</strong>ing into <strong>and</strong> contamin<strong>at</strong>ing<br />
aquifers or surface w<strong>at</strong>er.<br />
All oil <strong>and</strong> gas producing st<strong>at</strong>es have specific regul<strong>at</strong>ions governing the plugging <strong>and</strong> ab<strong>and</strong>onment<br />
of wells. 140 Generally, however, when a well is plugged there are a number of steps th<strong>at</strong><br />
are taken. First, the downhole equipment is removed <strong>and</strong> the perfor<strong>at</strong>ed sections of the well<br />
bore are cleaned of scale <strong>and</strong> other wastes. Then, a minimum of three cement plugs, each<br />
between 100-200 feet in length, are placed into the well. Plugs should be placed: 1) into the<br />
perfor<strong>at</strong>ed zones of the well, in order to prevent the inflow of fluid; 2) in the middle of the wellbore;<br />
<strong>and</strong> 3) within a couple hundred feet of the surface. Also, fluid with an appropri<strong>at</strong>e density<br />
is placed between the cement plugs in order to maintain adequ<strong>at</strong>e pressure in the voids.<br />
Finally, the casing is cut off below the surface <strong>and</strong> capped with a steel pl<strong>at</strong>e welded to the casing.<br />
Surface reclam<strong>at</strong>ion should then be undertaken to restore n<strong>at</strong>ural soil consistency <strong>and</strong><br />
plant cover.<br />
FIGURE I-22. LEFT-RIGHT: PLUGGED WELL, NOT RECLAIMED. PLUGGED WELL, RECLAIMED. Photo <strong>at</strong> right<br />
used with permission of Vermejo Park Ranches.<br />
Conversion to an Injection Well<br />
If the well is loc<strong>at</strong>ed in an area where a company has many nearby wells still in production,<br />
the company may decide to convert the well to an injection well. If this occurs, the well will be<br />
regul<strong>at</strong>ed by the federal government as an Underground Injection Control (UIC) Class II<br />
Injection well, <strong>and</strong> will be subject to the federal Safe Drinking W<strong>at</strong>er Act <strong>and</strong> Underground<br />
Injection Control Regul<strong>at</strong>ions. 141 Such a well can be used either for disposal of the produced<br />
w<strong>at</strong>er from other wells, or as part of oil enhancement oper<strong>at</strong>ions in the production field.<br />
Reclam<strong>at</strong>ion<br />
Federal, st<strong>at</strong>e, <strong>and</strong> sometimes local rules <strong>and</strong> regul<strong>at</strong>ions describe how reclam<strong>at</strong>ion is supposed<br />
to occur when a site is ab<strong>and</strong>oned. In some st<strong>at</strong>es, companies are required to provide<br />
financial assurance (e.g., bonds) to ensure th<strong>at</strong> some funds are available to plug the wells <strong>and</strong><br />
carry out the reclam<strong>at</strong>ion activities. Reclam<strong>at</strong>ion clauses in surface use agreements negoti<strong>at</strong>ed<br />
during the early stages also come into play <strong>at</strong> this stage.<br />
Full reclam<strong>at</strong>ion should leave the l<strong>and</strong>, air <strong>and</strong> w<strong>at</strong>er in the same condition as before oil <strong>and</strong><br />
gas development was carried out. This is rarely the case. In many st<strong>at</strong>es, the unwillingness of<br />
companies to completely restore the original environment is accepted by st<strong>at</strong>e governments.<br />
Consequently, oper<strong>at</strong>ors are required only to reclaim the l<strong>and</strong> “as nearly as is possible” to it predevelopment<br />
condition.<br />
I-29