plc software - 32.20<br />

These design sheets are provided as examples. PLC vendors often supply similar<br />

sheets. Many companies also have their own internal design documentation procedures. If<br />

you are in a company without st<strong>and</strong>ardized design formats, you should consider implementing<br />

such a system.<br />

32.6 COMMISIONING<br />

When a new machine is being prepared for production, or has been delivered by a<br />

supplier, it is normal to go through a set of commissioning procedures. Some typical steps<br />

are listed below.<br />

1. Visual inspection<br />

• verify that the machine meets internal <strong>and</strong> external safety codes<br />

- electrical codes<br />

- worker safety codes (e.g., OSHA)<br />

• determine if all components are present<br />

2. Mechanical installation<br />

• physically located the machine<br />

• connect to adjacent machines<br />

• connect water, air <strong>and</strong> other required services<br />

3. Electrical installation<br />

• connect grounds <strong>and</strong> power<br />

• high potential <strong>and</strong> ground fault tests<br />

• verify sensor inputs to the PLC<br />

4. Functional tests<br />

• start the machine <strong>and</strong> test the emergency stops<br />

• test for basic functionality<br />

5. <strong>Process</strong> verification<br />

• run the machine <strong>and</strong> make adjustments to produce product<br />

• collect process capability data<br />

• determine required maintenance procedures<br />

6. Contract/specification verification<br />

• review the contact requirements <strong>and</strong> check off individually on each one<br />

• review the specification requirements <strong>and</strong> check off each one individually<br />

• request that any non-compliant requirements are corrected<br />

7. Put into production<br />

• start the process in the production environment <strong>and</strong> begin normal use<br />

32.7 SAFETY<br />

-<br />

www.PA<strong>Control</strong>.com