Unit 1 controls F, Unit 2 controls P<br />

Each test groups is configured as follows:<br />

Import from grid:<br />

− Unit 1 at 50% <strong>of</strong> its ratings, Unit 2 at 50% <strong>of</strong> its ratings – transfer to isl<strong>and</strong><br />

− Unit 1 at 10%, Unit 2 at 90% – transfer to isl<strong>and</strong> (i), usually Unit 2 reaches maximum output<br />

− From this (i) isl<strong>and</strong> operating point, remove a load , this backs <strong>of</strong>f the unit from maximum<br />

output<br />

− Again, from (i) reduce setpoint <strong>of</strong> Unit 2, this backs <strong>of</strong>f the unit from maximum output<br />

− Unit 1 at 90%, Unit 2 at 10% – transfer to isl<strong>and</strong>, usually Unit 1 reaches maximum output<br />

Export to grid:<br />

− Unit 1 at 50% <strong>of</strong> its ratings, Unit 2 at 50% <strong>of</strong> its ratings – transfer to isl<strong>and</strong><br />

− Unit 1 at 10%, Unit 2 at 90% – transfer to isl<strong>and</strong>, usually Unit 1 reaches zero output<br />

− Unit 1 at 90%, Unit 2 at 10% – transfer to isl<strong>and</strong> (e), usually Unit 2 reaches zero output<br />

− From this (e) isl<strong>and</strong> operating point, insert a load , this backs <strong>of</strong>f the unit from zero output<br />

− Again, from (e) increase setpoint <strong>of</strong> Unit 2, this backs <strong>of</strong>f the unit from zero output<br />

Every group has five experiments while importing <strong>and</strong> five while exporting. When at least one <strong>of</strong><br />

the units regulates feeder flow (all but the very first test group, series PP), then there are two<br />

added experiments when importing from the grid:<br />

− Unit 1 at 10%, Unit 2 at 90% - the unit regulating F is switched to a wrong setpoint that will<br />

determine either max or zero power output.<br />

− Unit 1 at 90%, Unit 2 at 10% - the same unit regulating F is switched to a wrong setpoint that<br />

will determine max (if before it was zero) or zero (if before it was max) output.<br />

If both units are regulating F, then one unit is arbitrarily picked up to test the wrong setpoint<br />

feature.<br />

In summary, in each test group the experiments will be carried in the order shown in Table 7.1.<br />

92