field case study of industrial plant operating with natural refrigerants<br />
Introduction<br />
In 2001 one of Cofely Refrigeration’s customers decided to convert and increase the<br />
capacity and freezing temperature of a refrigeration plant from 1300kW at -42°C to<br />
2900kW at -51°C. The refrigeration plant in question had been in use with refrigerant<br />
R22 since 1997.<br />
For the installation it was suggested that the plant be re-built by re-using the<br />
installed compressors and using CO 2<br />
to extend the plant capacity with lower process<br />
temperatures. The plant extension had to be executed between October 2004 and June<br />
2005, starting with the conversion of the F250VLD units to N250VLD for use with NH 3<br />
.<br />
About the company<br />
MAYEKAWA is a world-leading supplier of industrial<br />
cooling & freezing systems, refrigeration compressors,<br />
and heat pumps. It actively promotes the “Natural<br />
Five” refrigerants, among them ammonia, for air<br />
conditioning, freezing, and cold storage. Mayekawa/<br />
MYCOM has more than 25,000 MYCOM compressors<br />
running in over 100 countries.<br />
More information at:<br />
www.mayekawa.eu<br />
Contact Information<br />
Eric Delforge<br />
eric.delforge@mayekawa.eu<br />
The new plant was installed in 5 phases over the period staring from weeks 35 of 2004<br />
to week 25 of 2005:<br />
• 1: modification of R22 plant to NH 3<br />
(from week 18 to week 23-2005)<br />
• 2: installation of CO 2<br />
equipment (from week 49-2004 to week 10-2005)<br />
• 3: start-up of C5 & C6 (from week 10-2005 to week 14-2005)<br />
• 4: start up of C7 (wk 16-2005)<br />
• 5: start-up of C8 & C9 (week 18-2005 to week 20-2005)<br />
• Full production from week 25-2005<br />
About the System<br />
The new plant for processing and freezing meat, would operate 24hrs/day 5 days a<br />
week, and would involve:<br />
• Chilling in the process working rooms requiring -12°C;<br />
• Product freezing with plate freezers (4x550kW);<br />
• Quick freezing tunnel (1x600kW);<br />
• Spiral freezer (1x600kW) requiring -51°C;<br />
• Freezing in stores requiring -35°C.<br />