field case study of industrial plant operating with natural refrigerants<br />

Introduction<br />

In 2001 one of Cofely Refrigeration’s customers decided to convert and increase the<br />

capacity and freezing temperature of a refrigeration plant from 1300kW at -42°C to<br />

2900kW at -51°C. The refrigeration plant in question had been in use with refrigerant<br />

R22 since 1997.<br />

For the installation it was suggested that the plant be re-built by re-using the<br />

installed compressors and using CO 2<br />

to extend the plant capacity with lower process<br />

temperatures. The plant extension had to be executed between October 2004 and June<br />

2005, starting with the conversion of the F250VLD units to N250VLD for use with NH 3<br />

.<br />

About the company<br />

MAYEKAWA is a world-leading supplier of industrial<br />

cooling & freezing systems, refrigeration compressors,<br />

and heat pumps. It actively promotes the “Natural<br />

Five” refrigerants, among them ammonia, for air<br />

conditioning, freezing, and cold storage. Mayekawa/<br />

MYCOM has more than 25,000 MYCOM compressors<br />

running in over 100 countries.<br />

More information at:<br />

www.mayekawa.eu<br />

Contact Information<br />

Eric Delforge<br />

eric.delforge@mayekawa.eu<br />

The new plant was installed in 5 phases over the period staring from weeks 35 of 2004<br />

to week 25 of 2005:<br />

• 1: modification of R22 plant to NH 3<br />

(from week 18 to week 23-2005)<br />

• 2: installation of CO 2<br />

equipment (from week 49-2004 to week 10-2005)<br />

• 3: start-up of C5 & C6 (from week 10-2005 to week 14-2005)<br />

• 4: start up of C7 (wk 16-2005)<br />

• 5: start-up of C8 & C9 (week 18-2005 to week 20-2005)<br />

• Full production from week 25-2005<br />

About the System<br />

The new plant for processing and freezing meat, would operate 24hrs/day 5 days a<br />

week, and would involve:<br />

• Chilling in the process working rooms requiring -12°C;<br />

• Product freezing with plate freezers (4x550kW);<br />

• Quick freezing tunnel (1x600kW);<br />

• Spiral freezer (1x600kW) requiring -51°C;<br />

• Freezing in stores requiring -35°C.<br />

80