2009-10 (16.6 MB) - The National Institute of Open Schooling
2009-10 (16.6 MB) - The National Institute of Open Schooling
2009-10 (16.6 MB) - The National Institute of Open Schooling
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>National</strong> <strong>Institute</strong> <strong>of</strong> <strong>Open</strong> <strong>Schooling</strong><br />
Canteen Services, Arrangement <strong>of</strong> Model<br />
Examination Center , Computer Animation Lab/ Data<br />
Centre, purchase <strong>of</strong> different variety <strong>of</strong> paper mainly<br />
for printing self instructional material for students<br />
enrolled and meeting requirement <strong>of</strong> other items<br />
required by HODs <strong>of</strong> NIOS fall under the purview<br />
<strong>of</strong> Building, Maintenance and Purchase Section.<br />
<strong>The</strong> tasks <strong>of</strong> Operationalsing Guest House<br />
accommodation available at A-31,Sec-62, Noida,<br />
Renovation and development <strong>of</strong> Reception area to<br />
work as a facilitation centre, furnishing <strong>of</strong> conference<br />
Halls, construction <strong>of</strong> porch, up gradation <strong>of</strong> drivers<br />
room, purchase <strong>of</strong> paper and other materials indented<br />
by HODs was also undertaken.<br />
15.2.1 Completion Certificate <strong>of</strong> A-24-25,<br />
Sector-62, Noida Building premises<br />
from NOIDA Authority<br />
NOIDA Authority has issued Completion Certificate/<br />
NOC for A-24-25, Sector-62, Noida building which<br />
was completed in December, 2006. Completion<br />
Certificate was received on 04-06-<strong>2009</strong>.<br />
15.2.2 Permanent Electricity Connection<br />
at NIOS campus A-24-25 and A-31<br />
Buildings<br />
After the Completion Certificate/NOC for both the<br />
buildings was issued, UP Electricity Department has<br />
sanctioned a load <strong>of</strong> 550 KW for A-31 and 750 KW<br />
for A-24-25, buildings and requested NIOS to<br />
deposit Rs. 2.07 crore for electric connection and<br />
underground cabling work. Since cost <strong>of</strong> UPPCL was<br />
very high therefore, NIOS took a decision to<br />
undertake the work itself. Work was awarded<br />
through <strong>Open</strong> Tender in January, 20<strong>10</strong> and<br />
completed in March, 20<strong>10</strong> in a record time and<br />
saved Rs. 78 Lacs.<br />
15.2.3 Maintenance <strong>of</strong> NIOS Premises<br />
Basic amenities such as housekeeping services,<br />
generator operation, running <strong>of</strong> lift services, security<br />
arrangements, upkeep <strong>of</strong> horticulture, communication<br />
services has been provided in both the buildings <strong>of</strong><br />
NIOS. Fire fighting equipments have also been put in<br />
place in all the floors <strong>of</strong> both the buildings.<br />
15.2.4 Subsidized Transport and Canteen<br />
Services<br />
As a welfare measure subsidized transport facility<br />
provided to NIOS staff has been continued this year<br />
too. Subsidized canteen facilities at both the buildings<br />
have also been provided to NIOS staff.<br />
15.2.5 Arrangement <strong>of</strong> Model Examination<br />
Centers<br />
In order to maintain the credibility <strong>of</strong> exam and to<br />
curb the malpractices in NIOS examinations,<br />
innovative steps were taken for examinations in April<br />
<strong>2009</strong> onwards. A model examination centers were<br />
established at NIOS HQ and in all Regional Centers.<br />
Installation <strong>of</strong> CCTVs, video recording during<br />
examination, security arrangements, use <strong>of</strong> public<br />
address system and other facilities required in conduct<br />
<strong>of</strong> smooth examinations were arranged. Seating<br />
arrangement <strong>of</strong> around 5000 candidates were made<br />
within NIOS premises.<br />
15.2.6 Computer Animation Lab/Data<br />
Centre<br />
NIOS has modernized Computer Animation Lab and<br />
Data Centre at NIOS HQ, and has also set up an<br />
online admission cells at all Regional Centers <strong>of</strong> NIOS.<br />
15.2.7 Purchase and Procurement<br />
Different varieties <strong>of</strong> printing paper was procured<br />
mainly for printing <strong>of</strong> self Instructional Materials (SIM)<br />
for students enrolled. This year 4870 MTs <strong>of</strong> paper<br />
worth Rs. 17 Crore was purchased. Other purchases<br />
<strong>of</strong> consumable and non-consumable items have also<br />
been done as per the GFR-2005<br />
15.3 Accounts<br />
15.3.1 Overview<br />
<strong>The</strong> Accounts Unit is one <strong>of</strong> the major branch <strong>of</strong><br />
Administration Deptt., which inter alia prepare Annual<br />
Accounts <strong>of</strong> NIOS in pursuance to Memorandum <strong>of</strong><br />
Association <strong>of</strong> NIOS Society and Govt. <strong>of</strong> India’s<br />
directive issued from time to time. It also keeps an<br />
account <strong>of</strong> all income collected from students,<br />
Regional Centres and Accredited <strong>Institute</strong>s in India<br />
and abroad and incurred all expenditure in respect <strong>of</strong><br />
all activities and programmes <strong>of</strong> NIOS.<br />
88 Annual Report <strong>2009</strong>-<strong>10</strong>