2011 Electric Service Requirements Manual, 2nd - Pacific Power
2011 Electric Service Requirements Manual, 2nd - Pacific Power
2011 Electric Service Requirements Manual, 2nd - Pacific Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />
Section 10<br />
Figure 10.8.3.1 − Transformer Mounting Base<br />
for Installation in a Current Transformer Enclosure<br />
(Single-Phase, Three-Wire, 800-Amp Max. EUSERC 328A, 328B)<br />
1 3/4”<br />
3/4”<br />
5”<br />
CT mounting bolts, 4 places<br />
7/8”<br />
1 3/8”<br />
N<br />
1 1/2”<br />
8 1/8”<br />
10‐32 machine screw<br />
and washer (drilled and<br />
tapped into bus)<br />
1 1/2”<br />
1 3/4”<br />
3/4” CT<br />
CT<br />
Cable termination bolts,<br />
4 places<br />
8” min.<br />
bus marking, “CT”; 2 places<br />
2”<br />
Insulating supports<br />
1/4”<br />
ÉÉ<br />
ÉÉ<br />
ÉÉ<br />
ÉÉ<br />
ÉÉ<br />
ÉÉ<br />
3 1/2”<br />
Insulating barrier<br />
This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.<br />
83