29.08.2014 Views

2011 Electric Service Requirements Manual, 2nd - Pacific Power

2011 Electric Service Requirements Manual, 2nd - Pacific Power

2011 Electric Service Requirements Manual, 2nd - Pacific Power

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />

Section 10<br />

Figure 10.8.3.1 − Transformer Mounting Base<br />

for Installation in a Current Transformer Enclosure<br />

(Single-Phase, Three-Wire, 800-Amp Max. EUSERC 328A, 328B)<br />

1 3/4”<br />

3/4”<br />

5”<br />

CT mounting bolts, 4 places<br />

7/8”<br />

1 3/8”<br />

N<br />

1 1/2”<br />

8 1/8”<br />

10‐32 machine screw<br />

and washer (drilled and<br />

tapped into bus)<br />

1 1/2”<br />

1 3/4”<br />

3/4” CT<br />

CT<br />

Cable termination bolts,<br />

4 places<br />

8” min.<br />

bus marking, “CT”; 2 places<br />

2”<br />

Insulating supports<br />

1/4”<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

3 1/2”<br />

Insulating barrier<br />

This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.<br />

83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!