2011 Electric Service Requirements Manual, 2nd - Pacific Power
2011 Electric Service Requirements Manual, 2nd - Pacific Power
2011 Electric Service Requirements Manual, 2nd - Pacific Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Section 7<br />
<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />
Figure 7.7.3.2 − Underground <strong>Service</strong> to a Free-Standing Meter Base, Wood Post<br />
meter<br />
<strong>Electric</strong>al label or permit shall be<br />
displayed on the meter base.<br />
6' max.<br />
4' min.<br />
Use protective bushings on conduit,<br />
as well as blocks and straps to<br />
support the conduit.<br />
Holes intended for drainage<br />
or cooling shall be kept clear.<br />
Unused mounting holes shall<br />
be covered.<br />
24” min.<br />
6 x 6 pressure‐treated post; see<br />
Section 7.7.3, Requirement 5.<br />
ÇÇÇ<br />
24” min.<br />
36” min.<br />
Ground per NEC Article 250.<br />
Figure 7.7.3.3 − Underground <strong>Service</strong> to a Free-Standing Meter Base, Manufactured Package<br />
FRONT VIEW<br />
Holes intended for drainage<br />
or cooling shall be kept clear.<br />
Unused mounting holes shall<br />
be covered.<br />
Ground per NEC Article 250.<br />
<strong>Electric</strong>al label or permit<br />
shall be displayed on the<br />
meter base.<br />
Set a 1/8” x 1” x 1” steel angle‐drive into<br />
the ground and attach it to each side of<br />
the pedestal with 1/4” or larger bolts.<br />
final grade<br />
meter<br />
circuit breakers<br />
SIDE VIEW<br />
72” max.<br />
42” min.<br />
18”-24”<br />
6” min<br />
final grade<br />
48” min.<br />
24” min.<br />
To <strong>Power</strong> Company<br />
To mobile home<br />
48<br />
This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.