2011 Electric Service Requirements Manual, 2nd - Pacific Power
2011 Electric Service Requirements Manual, 2nd - Pacific Power
2011 Electric Service Requirements Manual, 2nd - Pacific Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
Í<br />
<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />
Section 5<br />
Figure 5.1.1 − Meter Socket Clearance <strong>Requirements</strong><br />
36” min. clear wall space<br />
ceiling or obstruction<br />
10” min.<br />
ÉÉÉÉÉÉÉÉÉÉÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
9” min.<br />
78” min.<br />
head room<br />
ÉÉÉ<br />
ÉÉÉ<br />
wall or obstruction<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
ÉÉÉ<br />
No obstructions are allowed<br />
directly below the meter.<br />
finished grade (established prior to setting the meter)<br />
HORIZONTAL CLEARANCE<br />
Flush or surface mount<br />
VERTICAL CLEARANCE<br />
Flush or surface mount<br />
Building surface shall<br />
not project beyond<br />
face of box.<br />
ÍÉ<br />
ÍÉ<br />
Í<br />
Í<br />
2”x4” block between<br />
studs or 5 / 16 ” molly bolt<br />
Í<br />
Í<br />
Í<br />
Í<br />
36” working space<br />
ÍÉ<br />
ÍÉ<br />
ÉÍ<br />
ÍÉ<br />
Í<br />
Í<br />
36” working space<br />
Í<br />
Í<br />
Í<br />
Í<br />
4’ min.<br />
6’ max.<br />
ÍÉ<br />
ÍÉ<br />
finished grade (established prior to setting the meter)<br />
Í<br />
Í<br />
FLUSH MOUNT METER<br />
SURFACE MOUNT METER<br />
Requirement:<br />
The minimum unobstructed working space required in front of a single meter is 78 inches high,<br />
36 inches wide, and 36 inches deep (NEC 110.26 A). For current transformer (CT) and<br />
switchboard installations, see Section 10.<br />
Note: Dimensions do not refer to meters housed in EUSERC-approved switchboards or<br />
enclosures, such as EUSERC 354.<br />
This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.<br />
19