<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />

Section 10<br />

Table 10.7 − Minimum Pull Box Dimensions<br />

(Applies to the <strong>Power</strong> Company Portion of the Pull Box)<br />

Total <strong>Service</strong> “W” “Y” “X”<br />

Amps 3 Wire 4 Wire Depth Lug Height<br />

0−200 10 1/2” 14” 6” 11”<br />

201−400 10 1/2” 14” 6” 22”<br />

401−800 16 1/2” 22” 11” 26”<br />

801−1200 22 1/2” 30” 11” 26”<br />

10.8 Current Transformer Metering − 600 Volts, 800 Amps Maximum<br />

Current transformer (CT) metering is required for all services between 201 and 800 amperes,<br />

except single-phase services of 120/240 volts under 400 amperes, which shall be metered<br />

according to Section 10.4.<br />

Switchboard metering (see Section 10.14) is required for services over 800 amperes and may also<br />

be used for smaller loads.<br />

Two types of CT mounting configurations are approved by the <strong>Power</strong> Company:<br />

(a) Current Transformer Metering, Post-Mounted.<br />

(b) Current Transformer Metering, Wall-Mounted<br />

Figure 10.8.1 − Current Transformer Metering Mounting Configurations<br />

Do not install meter on<br />

hinged side of CT cabinet.<br />

14”<br />

min.<br />

Customer‐supplied<br />

3” galvanized rigid<br />

conduit (capped)<br />

(A) POST−MOUNTED, SIDE VIEW<br />

(B) WALL−MOUNTED<br />

The CT cabinet and meter shall be mounted outside the building as approved by the <strong>Power</strong><br />

Company. The meter shall not be mounted on the hinged side of a single-door CT cabinet.<br />

Where metering equipment is installed in a location susceptible to being struck by a vehicle, the<br />

customer shall install and maintain barrier posts approved by the <strong>Power</strong> Company (see Section<br />

9.9).<br />

This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.<br />