<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />

Section 10<br />

Figure 10.6.2 − Non-Residential Modular Meter Socket Installation<br />

customer's service<br />

entrance bus<br />

6” (or greater)<br />

depth spacer<br />

for clearance<br />

meter module<br />

permanent address labels<br />

meter module meter module meter module<br />

main<br />

disconnect<br />

(if required)<br />

pull box<br />

test blocks<br />

LINE<br />

LOAD<br />

LINE<br />

LOAD<br />

LINE<br />

LOAD<br />

breaker<br />

required<br />

breaker<br />

breaker<br />

required<br />

required<br />

TBF TBF TBF<br />

breaker<br />

required<br />

72” max.<br />

48” min.<br />

sealable<br />

enclosure<br />

24” min.<br />

final grade<br />

Notes:<br />

1. Single-phase configuration is approved.<br />

2. A vertical clearance of 36” from the surface to the center of the lowest meter is acceptable if<br />

a 3-foot wide, flat, permanent surface (such as a concrete pad or walkway) below the meter is<br />

provided at the final grade.<br />

Figure 10.6.3 − Non-Residential Switch Board Metering<br />

(Direct−Connect, Floor Mounted)<br />

EUSERC 306<br />

pull box<br />

12” min.<br />

permanent<br />

address labels<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

ÉÉ<br />

ÉÉ<br />

É<br />

É<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

ÉÉ<br />

ÉÉ<br />

É<br />

É<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

Labeled service<br />

breakers are required<br />

for each service.<br />

The position of the<br />

breaker on the panel<br />

is determined by the<br />

manufacturer.<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

ÉÉ<br />

É<br />

É<br />

É<br />

É<br />

É<br />

TBF<br />

TBF<br />

TBF<br />

TBF<br />

36” min.<br />

75” max.<br />

concrete pad<br />

multiple meter section<br />

6” min. spacers<br />

multiple meter section<br />

ÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂ<br />

ÉÉ É<br />

ÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂÂ<br />

Notes:<br />

a. The customer must provide a concrete pad for switchboard metering service sections<br />

and pull boxes.<br />

b. A single-phase configuration is acceptable.<br />

This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.<br />