Section 7<br />
<strong>2011</strong> <strong>Electric</strong> <strong>Service</strong> <strong>Requirements</strong>, 2 nd Edition<br />
Figure 7.7.1 − Underground <strong>Service</strong> to Dwellings with Permanent Foundations<br />
Ç<br />
Ç<br />
Meter Attached to Dwelling (UG)<br />
Meter to Overhead Transformer<br />
3' Min.<br />
10' Max.<br />
6’ Max.<br />
4’ Min.<br />
The customer<br />
provides the trench,<br />
conduit and sweeps.<br />
All above‐ground<br />
conduit shall meet the<br />
NEC requirement of<br />
Schedule 40 or better.<br />
The sweep is provided by the customer<br />
and installed as directed by the <strong>Power</strong><br />
Company. Conduit and the pole (at ground<br />
line) shall have 8” of separation.<br />
24” Min.<br />
24” Min.<br />
Customer<br />
installed conduit<br />
<strong>Power</strong> Company<br />
installed equipment<br />
Meter to Underground Transformer Vault<br />
Meter to Secondary Junction Box<br />
The <strong>Power</strong> Company‐owns<br />
and installs the transformer<br />
and the cable.<br />
The sweep is provided by the<br />
customer and installed by the<br />
<strong>Power</strong> Company.<br />
junction box<br />
24” min.<br />
The customer provides<br />
the conduit and the vault.<br />
The conduit is glued to<br />
the vault by the customer.<br />
Customer<br />
installed conduit<br />
<strong>Power</strong> Company<br />
installed equipment<br />
44<br />
This manual shall be distributed and interpreted in its entirety. Individual pages will not represent all the requirements necessary for an installation.