What’s New in this <strong>Regional</strong> <strong>Land</strong> <strong>Transport</strong> <strong>Programme</strong><br />

Three region-wide <strong>Land</strong> <strong>Transport</strong> <strong>Programme</strong>s have been produced<br />

by ARTA since being created in 2004. The LTMA 2008 now requires<br />

ARTA to prepare a RLTP, which has a significantly wider focus than<br />

the previous <strong>Auckland</strong> LTP.<br />

The changes to the previous <strong>Auckland</strong> LTPs can be summarised<br />

as follows:<br />

> ARTA has updated its prioritisation process to take account of<br />

the <strong>2009</strong> GPS.<br />

> State highway activities are now included in the ARTA process.<br />

> The RLTP has to include comment on police activities.<br />

In accordance with the widened scope of the RLTP, ARTA has issued<br />

guidelines outlining regional and national priorities for funding,<br />

enabling local authorities and the NZTA (State highways) to submit<br />

appropriate applications to be considered by ARTA for inclusion in<br />

the RLTP.<br />

Following consultation on this first RLTP, ARTA has considered<br />

submissions, amended the document as necessary and approved a<br />

final RLTP, which will be submitted to the NZTA. NZTA will then<br />

consider the RLTP, and prepare a National <strong>Land</strong> <strong>Transport</strong> <strong>Programme</strong><br />

which will allocate funding. Any activity that is not included in the<br />

RLTP may not be included in the NLTP, even if it is a NZTA State<br />

highway project.<br />

><br />

><br />

The RLTP now has a three-year time period.<br />

This RLTP includes packages and groups of linked projects.<br />

As this is a three-year programme and includes State highway<br />

projects, it prioritises over 950 projects, compared to around 300<br />

projects in each of the previous LTPs, as shown in Figure 2.3 below.<br />

Figure 2.3: Number of projects in past <strong>Land</strong> <strong>Transport</strong> <strong>Programme</strong>s compared with the <strong>Regional</strong> <strong>Land</strong> <strong>Transport</strong> <strong>Programme</strong><br />

Number of schemes analysed in the <strong>2009</strong>/10-2011/12 RLTP compared to the 2006/07-2008/09 LTPs<br />

1000<br />

900<br />

800<br />

700<br />

600<br />

Number of activities<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

2006/07 2007/08 2008/09 <strong>2009</strong>/12<br />

LTP year<br />

6