Table 5.4: Summary of the RLTP by Activity Class (Continued)<br />
Effect<br />
required on<br />
GPS impacts<br />
><br />
><br />
GPS impacts require a reduction in fatalities and serious<br />
injuries from road crashes. Well-maintained roads are safer<br />
to drive. This is particularly true of State highways where<br />
speeds are higher.<br />
Improving the riding surface of roads has a dramatic effect<br />
on fuel use and vehicle efficiency. Well maintained roads<br />
require less emergency treatment and therefore have more<br />
reliable journey times, which will contribute to GPS targets.<br />
><br />
GPS impacts require improvements in journey time<br />
reliability and an easing of severe congestion. New and<br />
improved local roads will help to meet these impacts.<br />
New State Highway Infrastructure<br />
Key Planned<br />
Projects<br />
><br />
><br />
Completing the Western Ring Route with the<br />
implementation of the SH20–SH1 Manukau link, SH18<br />
extension from Hobsonville to Westgate and the Waterview<br />
connection will provide a complete alternative for the<br />
movement of people and goods to State Highway 1 from<br />
Manukau through to Albany, providing both regional and<br />
inter-regional benefits.<br />
To reduce southbound congestion on the Southern<br />
Motorway, a fourth southbound lane on the motorway<br />
between Gillies Avenue and Greenlane will be constructed,<br />
and the Newmarket Viaduct will be replaced with a new<br />
structure.<br />
Value<br />
GPS lower<br />
and upper<br />
bands<br />
Total = $1,462.2m<br />
NZTA share = $1,462.2m<br />
Proportion of midpoint national share = 49.4%<br />
Lower = $2,475m<br />
Upper = $3,450m<br />
Issues<br />
Effect<br />
required on<br />
GPS impacts<br />
><br />
><br />
Sufficient funds are available within the GPS funding<br />
allocation. NZTA highways and Network Operations have<br />
increased their bid for funding by $509m since the draft<br />
RLTP – this is a very significant increase.<br />
GPS impacts require improvements in journey time<br />
reliability and an easing of severe congestion. New and<br />
improved State highways will help to meet these impacts.<br />
**<br />
Note: While projects such as electrification of the rail network and the purchase of electric trains will be funded from sources other than the <strong>Regional</strong> <strong>Land</strong> <strong>Transport</strong><br />
<strong>Programme</strong>, they are key components of the <strong>Auckland</strong> transport system.<br />
***<br />
Note: ARTA’s administration and professional services costs are not included in the above table or the detailed funding requests, but are included in LTP Online.<br />
30