02.10.2014 Views

Regional Land Transport Programme 2009 - 2010 (2MB) - Auckland ...

Regional Land Transport Programme 2009 - 2010 (2MB) - Auckland ...

Regional Land Transport Programme 2009 - 2010 (2MB) - Auckland ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 5.4: Summary of the RLTP by Activity Class<br />

<strong>Transport</strong> Planning<br />

Demand Management and Community <strong>Programme</strong>s<br />

Key planned<br />

projects<br />

><br />

><br />

><br />

Crash reduction planning by the NZTA and TAs.<br />

Freight strategies and plans by the NZTA, ARC and TAs.<br />

Corridor designation for the additional Waitemata Harbour<br />

Crossing to improve accessibility for all modes from and to<br />

the North of the Isthmus.<br />

><br />

><br />

><br />

Continued school and work travel planning by ARTA and<br />

the TAs to achieve the target of a 9% reduction in car trips<br />

to school and a reduction in car trips to participating work<br />

places by 2016.<br />

Community road safety projects such as child restraint<br />

clinics, drink driving and driver speed education will<br />

contribute to achieving 400 or fewer fatal and serious<br />

crashes by 2012.<br />

Trialling new and innovative tools and techniques such as<br />

personalised journey planning, carpooling and area-wide<br />

travel planning to increase travel choices.<br />

Value<br />

National GPS<br />

lower and<br />

upper bands<br />

Total = $43.9m<br />

NZTA share = $34.0m<br />

Local share = $9.8m<br />

Proportion of midpoint national share = 32%<br />

Lower = $96m<br />

Upper = $114m<br />

Total = $43.2m<br />

NZTA share = $32.5m<br />

Local share = $10.8m<br />

Proportion of midpoint national share = 23%<br />

Lower = $120m<br />

Upper = $165m<br />

Issues<br />

Effect<br />

required on<br />

GPS impacts<br />

> Sufficient funds are available within the GPS funding > Sufficient funds are available within the GPS funding<br />

allocation.<br />

allocation.<br />

> Anticipated future growth and GPS impacts require step<br />

changes in the way people and goods are moved<br />

compared to current patterns. Good quality transport<br />

planning is essential to achieve these changes.<br />

><br />

><br />

Establishing innovative and effective demand management<br />

techniques and increasing school and workplace travel<br />

plans, offers wider travel choices, which reduces reliance<br />

on travel by private car, which in turn decongests local<br />

roads.<br />

Community road safety programmes significantly<br />

contribute to reducing road deaths and serious injuries on<br />

<strong>Auckland</strong>’s road network.<br />

Walking and Cycling Facilities<br />

Public <strong>Transport</strong> Services<br />

Key planned<br />

projects<br />

><br />

><br />

><br />

><br />

Providing walking and cycling facilities on local roads<br />

affected by the SH20 – SH1 motorway connection.<br />

Improvements to the Northwestern cycleway.<br />

Designing and constructing a cycle connection between<br />

SH1 and SH16 in the central Isthmus.<br />

Constructing over 38 kilometres of off-road walking and<br />

cycling facilities in Flat Bush.<br />

><br />

><br />

><br />

><br />

Improved connectivity into rail stations plus further<br />

development of high-quality, high-frequency services.<br />

Bus service improvements on Isthmus, Waitakere, NW<br />

Rodney, Manukau and Papakura.<br />

Provision of a new ferry service to Hobsonville.<br />

Increasing train services towards 10 minutes peak and 15<br />

minutes off-peak and extending operating hours.<br />

Value<br />

National GPS<br />

lower and<br />

upper bands<br />

Total = $92.2m<br />

NZTA share = $59.9m<br />

Local share = $32.2m<br />

Proportion of midpoint national share = 114%<br />

Lower = $30m<br />

Upper = $75m<br />

Total = $713.6m<br />

NZTA share = $386.7m<br />

Local share = $326.8m<br />

Proportion of midpoint national share = 61%<br />

Lower = $585m<br />

Upper = $675m<br />

Issues<br />

><br />

><br />

The NZTA share required for the <strong>Auckland</strong> region exceeds<br />

the midpoint of the national GPS band by $7 million or<br />

14% and would require 80% of the national upper band.<br />

Walking and cycling schemes associated with motorways<br />

are sometimes necessary to mitigate the barrier effects to<br />

movement on pedestrians and cyclists created by the<br />

building of the motorway. In these cases, where the<br />

purpose of the scheme is to mitigate the negative effects<br />

of the motorway, whether the motorway is existing or<br />

proposed, the costs of these schemes could be borne by<br />

the New and Improved Infrastructure for State Highway<br />

activity class as opposed to the Walking and Cycling activity<br />

class. This would reduce the over-subscription in walking<br />

and cycling facilities.<br />

><br />

><br />

><br />

Sufficient funding is available within the national GPS<br />

allocation. Proposed improvements are limited by the<br />

availability of funds. At this level of funding, some<br />

reductions in bus services will be necessary.<br />

Bus service improvements require integrated ticketing and<br />

fares, and bus priority measures on local roads and State<br />

highways to optimise patronage growth.<br />

Rail service improvements and electrification are dependent<br />

on KiwiRail’s infrastructure programme and timetable.<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!