2.4 Ranking schemes<br />
Finally, in order to prioritise projects with the same profile, a points<br />
system is used. Projects which align with the ‘Strategic Focus Areas’<br />
stated in Chapter 4 – Statement of Priorities, are awarded points.<br />
Focus Area 1 – Greater focus on regional arterial roads, which is<br />
considered of highest importance is awarded 5 points, Focus Area 2<br />
– Greater focus on safety engineering for streets and roads is awarded<br />
4 points and so on. In addition, if a project aligns with the short-term<br />
challenges as stated in Chapter 4 a further point is awarded<br />
It is important to note that GPS impacts are explicitly taken account<br />
of in the prioritisation process via the Strategic Focus Areas, and the<br />
Seriousness challenges and Effectiveness objectives.<br />
Finally, all points are added up and the projects with the highest<br />
number of points are ranked higher in the priority list than lower<br />
scoring projects.<br />
Figure 1 summarises the prioritisation process.<br />
Figure 1: Prioritisation process<br />
Activity<br />
submitted<br />
No<br />
Discretionary<br />
activity?<br />
Yes<br />
No<br />
Committed<br />
activity?<br />
Yes<br />
No<br />
Generic<br />
activity?<br />
Yes<br />
• Profile Seriousness and<br />
Effectiveness as ‘high’<br />
for all activities<br />
• Rank above<br />
discretionary activities<br />
Rank above<br />
discretionary<br />
activities<br />
Profile Seriousness,<br />
Urgency and<br />
Effectiveness<br />
Generic profile<br />
Seriousness and<br />
Effectiveness<br />
Profile Efficiency<br />
Rank activities with same<br />
profile based on:<br />
• Strategic balance<br />
• Short-term challenges<br />
• Strategic focus areas<br />
(include GPS)<br />
85