The following conclusions can be drawn from the changes in funding<br />

allocations:<br />

> When comparing the <strong>2009</strong> GPS allocation (column (3)) with<br />

current funding levels (column titled (1)), there has been a large<br />

increase in funding for new and improved State highways, this<br />

reflects the Government’s philosophy to invest heavily in this area<br />

and contrasts markedly with the 2008 GPS allocation which<br />

proposed to reduce funding on State highways.<br />

> Maintenance and renewals of local roads and State highways,<br />

and public transport services have seen reductions in funding<br />

allocations in the <strong>2009</strong> GPS (column (3)) compared with 2008<br />

GPS (column (2)), but an increase compared to current funding<br />

levels (column (1)).<br />

> New and improved local roads are allocated the same funding in<br />

the <strong>2009</strong> GPS as in the 2008 GPS, but lower than current levels.<br />

> The funding allocated to public transport infrastructure has<br />

reduced in the <strong>2009</strong> GPS when compared to current levels and<br />

the 2008 GPS. A significant proportion of the reduction relates to<br />

Wellington rail commitments which will be funded outside the<br />

National <strong>Land</strong> <strong>Transport</strong> Fund (NLTF). The Government has<br />

requested that <strong>Auckland</strong> rail station funding is sought through<br />

the NTLF, however, it appears that insufficient allowance has been<br />

made for the additional call on funding in this activity class.<br />

> The funding allocated to demand management and walking/<br />

cycling facilities in the <strong>2009</strong> GPS has reduced when compared to<br />

both 2008 GPS and current levels, and therefore must be<br />

considered a contraction in real terms. However, the NZTA has<br />

indicated that there will also be cycling and walking benefits<br />

from additional investment in State highways.<br />

Table 5.3 compares the funding for transport proposed by this RLTP<br />

with the <strong>2009</strong> GPS transport funding allocations.<br />

Table 5.3: Comparison of funding requested through the RLTP and the <strong>2009</strong> GPS funding allocations<br />

Activity class Final RLTP Midpoint of<br />

Local share <strong>Regional</strong> Region total<br />

<strong>2009</strong> GPS<br />

NZTA share<br />

% <strong>Regional</strong><br />

NZTA share of<br />

the <strong>2009</strong> GPS<br />

(1) (2) (3) (4) (2)/(4)<br />

($M) ($M) ($M) ($M)<br />

<strong>Transport</strong> Planning 10 34 44 105 32%<br />

Demand Management and Community <strong>Programme</strong>s 11 32 43 143 23%<br />

Walking and Cycling Facilities 32 60 92 53 114%<br />

Public <strong>Transport</strong> Services 327 387 714 630 61%<br />

Public <strong>Transport</strong> Infrastructure 123 236 359 180 131%<br />

Maintenance Local Roads 150 121 271 728 17%<br />

Maintenance State Highways 0 182 182 928 20%<br />

Renewal Local Roads 198 159 357 690 23%<br />

Renewal State Highways 0 115 115 640 18%<br />

New and Improved Local Roads 328 399 727 600 67%<br />

New and Improved State Highways 0 1,462 1,462 2,963 49%<br />

Total 1,178 3,187 4,365 7,658 42%<br />

Table 5.3 shows that the total funding sought through this RLTP is over $4.36 billion of which $3.19 billion is from the NLTP and $1.18 billion is<br />

through local share. Overall, approximately 42% of national funds for transport are expected to be spent in the <strong>Auckland</strong> region.<br />