1 INTRODUCTION<br />

This <strong>Regional</strong> <strong>Land</strong> <strong>Transport</strong> <strong>Programme</strong> (RLTP) has been prepared<br />

by the <strong>Auckland</strong> <strong>Regional</strong> <strong>Transport</strong> Authority (ARTA). The RLTP<br />

prioritises planned transport activities for the following three years<br />

which qualify for government funding through the New Zealand<br />

<strong>Transport</strong> Agency (NZTA).<br />

ARTA is required to prepare a RLTP every three years covering all<br />

transport activities undertaken by the NZTA HNO, <strong>Auckland</strong> local<br />

authorities and ARTA. Its mandate covers the <strong>Auckland</strong> region and all<br />

land transport modes except rail track responsibilities. In preparing<br />

the RLTP, ARTA provides a view on the land transport priorities for the<br />

region, as well as the future programmes of other transport agencies<br />

acting in the region. The legislative requirements relating to the<br />

<strong>Auckland</strong> RLTP are summarised in Appendix 1.<br />

This <strong>Auckland</strong> RLTP details the funding applications for the <strong>2009</strong>/10,<br />

<strong>2010</strong>/11 and 2011/12 years. ARTA’s main task is to prioritise these<br />

funding applications so that, when there is insufficient funding to<br />

carry out all the activities that the region may wish to see proceed,<br />

the most important schemes are funded first. This prioritisation is<br />

based on ARTA’s identification of the issues facing <strong>Auckland</strong>’s<br />

transport system both now and in the future. The prioritisation<br />

process is contained in the <strong>Auckland</strong> <strong>Transport</strong> Plan (ATP), which is<br />

also prepared by ARTA.<br />

Greenlane roading improvements (now completed)<br />