<strong>Laboratory</strong> <strong>Automation</strong> <strong>Hardware</strong><br />

Economic Feasibility Analysis<br />

The economic feasibility analysis is conducted<br />

using the example of a polymerisation process in the<br />

laboratory reactor.<br />

I. Manual Operation Mode<br />

Test:<br />

Operation Hours<br />

Weighing out 1<br />

Heating 1<br />

Dosing 4<br />

Secondary Polymerisation 4<br />

Emptying and Cleaning 1<br />

Total 11<br />

Start of test,e.g. at 7:30a.m., test completed at<br />

6:00p.m.<br />

According to this, only one test per day is possible!<br />

II. Automated Test Control with the<br />

LabManager<br />

Unattended procedure with:<br />

� Temperature Control<br />

� Dosing<br />

� Torque Monitoring<br />

� Recording of Test Data<br />

� Online Evaluation<br />

� Cleartext Protocol<br />

� Remote Alarming etc., if required<br />

Day Routine:<br />

First test start, e.g. at 8:00a.m., test completed at<br />

7:00p.m. In the meantime, the laboratory technician<br />

is free for the evaluation of last night's automatic run<br />

and the preparations for the next tests.<br />

Second test start, e.g. at 7:30p.m.<br />

Test completed at 6:30a.m. (unattended).<br />

According to this, two tests per day are now possible<br />

instead of one as before!<br />

The laboratory utilisation is improved by 100%.<br />

Cost Factors EUR<br />

Direct costs of the laboratory<br />

automation<br />

25,000.00<br />

Planning, familiarisation, plant<br />

upgrade<br />

10,000.00<br />

User Schooling 3,000.00<br />

Total Cost 38,000.00<br />

The amortisation period is evaluated out of the cost<br />

of one laboratory day (e.g. 750 Euro) and the total<br />

cost:<br />

Amortisation Period = 50 days!<br />

Even in the worst case scenario, assuming an<br />

improvement laboratory utilisation of merely 15%,<br />

which accords to a saving of 21,000 Euro annually,<br />

the amortisation period is still below one year!<br />

Additional beneficial Effects:<br />

GLP-conform mode of operation by a significant<br />

improvement of the documentation, the quality and<br />

reproducibility.<br />

A further Pay-Off Calculation for Chemistry<br />

Laboratories<br />

Catalyst Research <strong>Laboratory</strong><br />

Test series (savings due to unattended night<br />

operation):<br />

Amortisation Period = 3 months!<br />

Colour R&D <strong>Laboratory</strong><br />

Frequently changing recipes (savings due to<br />

simplified parameterisation via HiBatch recipe<br />

control and unattended night operation).<br />

Amortisation Period = 6 months!<br />

Naturally, similar results are achieved in continuous<br />

operation, if, instead of having personnel directly at<br />

the location, it is only necessary to have an on-call<br />

duty and remote alarming.<br />

It is a known fact that one day a product is launched<br />

on to the market earlier can result in six to sevendigit<br />

additional revenue.<br />

This clearly indicates how much laboratory<br />

automation is nowadays a must!!<br />

Using project moduls shortens the process of<br />

creating projects significantly.<br />

30 Years of Excellence in Lab Scale Technology · Over 1.000 Products around the <strong>Laboratory</strong> Reactor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!