23.11.2014 Views

Automatic sprinkler, water spray and deluge systems - RedBookLive

Automatic sprinkler, water spray and deluge systems - RedBookLive

Automatic sprinkler, water spray and deluge systems - RedBookLive

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 3: SECTION 15.2<br />

FLOW SWITCH TESTING DEVICES<br />

This section lists products approved in accordance with:<br />

<br />

LPCB Schedule of requirements<br />

Flow switch testing devices for use under LPC Rules for <strong>Automatic</strong> Sprinkler Installations have been approved<br />

to a schedule of requirements developed by LPCB. The products shall be installed <strong>and</strong> maintained in<br />

accordance with the manufacturer's instructions.<br />

Project Fire Products Limited<br />

Pasturefields Lane Industrial Estate, Pasturefields Lane, Hixon, Staffordshire ST18 0PH, United Kingdom<br />

Tel: +44 (0)1889 270999 • Fax: +44 (0)845 2800116<br />

E-mail: sales@projectfire.co.uk • Website: www.projectfire.co.uk<br />

Certificate No: 060a<br />

Flow switch automatic tester system<br />

Product Name<br />

LPCB Ref. No.<br />

ZONECHECK 060a/01<br />

Certificate No: 060c<br />

Product Name<br />

Model ZC-R-25 (Zonecheck<br />

Residential)<br />

Model ZC-R-32 (Zonecheck<br />

Residential)<br />

Model ZC-R-40 (Zonecheck<br />

Residential)<br />

Model LT-ZCL-65-002 (Zonecheck<br />

Live) (Note 2)<br />

Model LT-ZCL-80-002 (Zonecheck<br />

Live) (Note 2)<br />

Model LT-ZCL-100-002 (Zonecheck<br />

Live) (Note 2)<br />

Model LT-ZCL-150-002 (Zonecheck<br />

Live) (Note 2)<br />

Model LT-ZCL-SA-002 (Zonecheck<br />

Special) (Note 2)<br />

Nominal Size<br />

(mm)<br />

Pipe<br />

Ends<br />

Gasket<br />

Type<br />

Maximum Working<br />

Pressure (bar)<br />

LPCB Ref.<br />

No.<br />

25.4 x 25.4 T EPDM 12 060c/07<br />

32 x 25.4 T EPDM 12<br />

40 x 25.4 T EPDM 12<br />

65 x 25.4 T EPDM 12 060c/04<br />

80 x 25.4 T EPDM 12<br />

100 x 25.4 T EPDM 12<br />

150 x 25.4 T EPDM 12<br />

65 x 25.4 T EPDM 12 060c/05<br />

80 x 25.4 T EPDM 12<br />

100 x 25.4 T EPDM 12<br />

150 x 25.4 T EPDM 12<br />

Guidance <strong>and</strong> approval conditions.<br />

Zonecheck shall be installed in accordance with Project Fire Products Limited ‘Instruction Booklet’, but subject to guidance below taking<br />

precedence.<br />

1) The Zonecheck system circulates, but does not draw-off <strong>water</strong> from the <strong>sprinkler</strong> system <strong>and</strong> consequently does not test any zone or<br />

control valves.<br />

2) System approval based on use with LPCB approved <strong>and</strong> listed flow switch.<br />

3) Effective operation of the Zonecheck system should be monitored.<br />

4) In the event of any servicing being warranted on this system, it shall be ensured that this does not impair effective <strong>sprinkler</strong> protection.<br />

5) Provision to test flow switches in the normal way (LPC Sprinkler Rules) should also be incorporated.<br />

6) It shall be ensured that the associated pipework is adequately vented <strong>and</strong> charged hydraulically.<br />

7) The automatic means of operation <strong>and</strong> recording does not form part of this approval.<br />

146 18 Jan 2014

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!