Automatic sprinkler, water spray and deluge systems - RedBookLive
Automatic sprinkler, water spray and deluge systems - RedBookLive
Automatic sprinkler, water spray and deluge systems - RedBookLive
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PART 3: SECTION 15.2<br />
FLOW SWITCH TESTING DEVICES<br />
This section lists products approved in accordance with:<br />
<br />
LPCB Schedule of requirements<br />
Flow switch testing devices for use under LPC Rules for <strong>Automatic</strong> Sprinkler Installations have been approved<br />
to a schedule of requirements developed by LPCB. The products shall be installed <strong>and</strong> maintained in<br />
accordance with the manufacturer's instructions.<br />
Project Fire Products Limited<br />
Pasturefields Lane Industrial Estate, Pasturefields Lane, Hixon, Staffordshire ST18 0PH, United Kingdom<br />
Tel: +44 (0)1889 270999 • Fax: +44 (0)845 2800116<br />
E-mail: sales@projectfire.co.uk • Website: www.projectfire.co.uk<br />
Certificate No: 060a<br />
Flow switch automatic tester system<br />
Product Name<br />
LPCB Ref. No.<br />
ZONECHECK 060a/01<br />
Certificate No: 060c<br />
Product Name<br />
Model ZC-R-25 (Zonecheck<br />
Residential)<br />
Model ZC-R-32 (Zonecheck<br />
Residential)<br />
Model ZC-R-40 (Zonecheck<br />
Residential)<br />
Model LT-ZCL-65-002 (Zonecheck<br />
Live) (Note 2)<br />
Model LT-ZCL-80-002 (Zonecheck<br />
Live) (Note 2)<br />
Model LT-ZCL-100-002 (Zonecheck<br />
Live) (Note 2)<br />
Model LT-ZCL-150-002 (Zonecheck<br />
Live) (Note 2)<br />
Model LT-ZCL-SA-002 (Zonecheck<br />
Special) (Note 2)<br />
Nominal Size<br />
(mm)<br />
Pipe<br />
Ends<br />
Gasket<br />
Type<br />
Maximum Working<br />
Pressure (bar)<br />
LPCB Ref.<br />
No.<br />
25.4 x 25.4 T EPDM 12 060c/07<br />
32 x 25.4 T EPDM 12<br />
40 x 25.4 T EPDM 12<br />
65 x 25.4 T EPDM 12 060c/04<br />
80 x 25.4 T EPDM 12<br />
100 x 25.4 T EPDM 12<br />
150 x 25.4 T EPDM 12<br />
65 x 25.4 T EPDM 12 060c/05<br />
80 x 25.4 T EPDM 12<br />
100 x 25.4 T EPDM 12<br />
150 x 25.4 T EPDM 12<br />
Guidance <strong>and</strong> approval conditions.<br />
Zonecheck shall be installed in accordance with Project Fire Products Limited ‘Instruction Booklet’, but subject to guidance below taking<br />
precedence.<br />
1) The Zonecheck system circulates, but does not draw-off <strong>water</strong> from the <strong>sprinkler</strong> system <strong>and</strong> consequently does not test any zone or<br />
control valves.<br />
2) System approval based on use with LPCB approved <strong>and</strong> listed flow switch.<br />
3) Effective operation of the Zonecheck system should be monitored.<br />
4) In the event of any servicing being warranted on this system, it shall be ensured that this does not impair effective <strong>sprinkler</strong> protection.<br />
5) Provision to test flow switches in the normal way (LPC Sprinkler Rules) should also be incorporated.<br />
6) It shall be ensured that the associated pipework is adequately vented <strong>and</strong> charged hydraulically.<br />
7) The automatic means of operation <strong>and</strong> recording does not form part of this approval.<br />
146 18 Jan 2014