24.12.2014 Views

GPTLR SERIES (2008 Release) - Maxon

GPTLR SERIES (2008 Release) - Maxon

GPTLR SERIES (2008 Release) - Maxon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STEP 4 - INSTALL CONTROL SWITCH<br />

1. Drill one 3/4“ hole and two #21–size holes in the vertical<br />

post on curb side of vehicle body as shown in FIG. 20-<br />

1A. Use template shown in FIG. 20-1B.<br />

VEHICLE BODY<br />

VERTICAL POST<br />

(CURB SIDE)<br />

1-3/4”<br />

7/8”<br />

HOLE DRILLING TEMPLATE<br />

FIG. 20-1B<br />

NOTE: Electrical lines must be run into<br />

pump box through sealing<br />

grommets (FIG. 20-2). To<br />

ensure a good seal on the electrical<br />

lines, never cut the sealing<br />

grommets.<br />

2. Cut tie strap on coiled wiring harness<br />

(FIG. 20-2). Pull the wiring harness<br />

through grommet on the pump<br />

mounting plate (FIG. 20-2).<br />

TIE<br />

STRAPS<br />

WIRING<br />

HARNESS<br />

RECOMMENDED POSITION FOR<br />

CONTROL SWITCH<br />

FIG. 20-1A<br />

GROMMET<br />

18”<br />

PUMP<br />

MOUNTING<br />

PLATE<br />

11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713<br />

FIG. 20-2<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!