GPTLR SERIES (2008 Release) - Maxon
GPTLR SERIES (2008 Release) - Maxon
GPTLR SERIES (2008 Release) - Maxon
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STEP 10 - FINISH WELDING LIFTGATE TO VEHICLE<br />
1. Weld the mounting<br />
plates to vehicle frame<br />
as shown in FIG. 39-1.<br />
2. Reinstall the split looms on<br />
RH side and LH side mounting<br />
plates (FIG. 39-2).<br />
VEHICLE FRAME<br />
(TYPICAL TRUCK<br />
FRAME SHOWN)<br />
TYPICAL - RH & LH<br />
MOUNTING PLATES<br />
!<br />
CAUTION<br />
When using electrical welder to weld on mounting plates, make sure the<br />
welder ground lead is connected directly to the mounting plate, as close as<br />
possible to the place being welded. Failure to comply can result in damaged<br />
cylinders and electrical parts.<br />
CAUTION<br />
Prevent damage to hydraulic hoses. Before welding next to hydraulic hoses,<br />
protect the hoses with a heat-resistant cover.<br />
CAUTION<br />
To protect the original paint system, a 3” wide area of paint must<br />
be removed from all sides of the weld area before welding.<br />
1/4”<br />
MOUNTING<br />
PLATE<br />
WELD TO VEHICLE FRAME (RH SIDE SHOWN)<br />
FIG. 39-1<br />
CAUTION<br />
To prevent injury and damaged parts, let mounting plate cool off from welding<br />
before reinstalling split loom.<br />
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713<br />
SPLIT<br />
LOOM<br />
MOUNTING<br />
PLATE<br />
REINSTALLING SPLIT LOOM (RH SIDE SHOWN)<br />
FIG. 39-2<br />
39