Brian Wheeler removed Item 7B. APPROVAL OF<br />
SPONSORSHIP OF A <strong>2012</strong> AQUATICS<br />
INSTRUCTION PROGRAM, for discussion.<br />
Supervisor Thacker moved for approval of the<br />
Consent Agenda with the exception of Items 7B and<br />
7-I. Supervisor White seconded the motion. Motion<br />
passed 6 to 0.<br />
A)APPROVAL OF BOARD OF SUPERVISOR<br />
MEETING MINUTES JUNE 13, <strong>2012</strong><br />
B) APPROVAL OF SPONSORSHIP OF A <strong>2012</strong><br />
AQUATICS INSTRUCTION PROGRAM – Mary<br />
Jane Arrington, Chairwoman of the Osceola YMCA,<br />
expressed her gratitude for the TWA donation of<br />
$7,500 for the past four years for the YMCA<br />
Aquatics instruction program. Ms. Arrington<br />
requested the Board to increase the <strong>Authority</strong>'s<br />
donation to $10,000. Supervisor White asked if<br />
there was a shortage of sponsorships for the<br />
program this year and Ms. Arrington replied that this<br />
year it has been exceedingly hard to reach their<br />
goal. Supervisor Bornstein stated that if the Board<br />
would agree to provide $2,000 of the additional<br />
request he would contribute the other $500.<br />
Supervisor White stated that the sponsorship is a<br />
good fit and made a motion for approval of a<br />
$9,500.00 donation from TWA and $500 from<br />
Supervisor Bornstein. Supervisor McKinnon<br />
seconded the motion. Motion passed 6 to 0.<br />
C)APPROVAL FOR ENGINEERING SCOPE OF<br />
SERVICES FOR THE <strong>2012</strong> TOHO 1 GRAVITY<br />
SEWER REHAB/REPLACE PROJECT<br />
D)APPROVAL OF AGREEMENT TO PROVIDE<br />
ALLEN BRADLEY PLC PARTS FOR SCADA<br />
SYSTEM<br />
E)APPROVAL OF THE CONSTRUCTION<br />
CONTRACT WITH WRIGHT’S EXCAVATING FOR<br />
THE REUSE WATER MAIN SYSTEM<br />
IMPROVEMENTS PROJECT<br />
F)AWARD OF CONTRACT TO VK JENSEN