Major Project Summaries 07.<strong>25</strong>.12<br />

Project Project Status Progress from Cost Schedule<br />

Name Description Previous Report Estimate<br />

POINCIANA PROJECTS<br />

Poinciana<br />

Gravity Sewer<br />

– Raise<br />

manholes to<br />

grade.<br />

TN<br />

Gravity Sewer<br />

– Repair &<br />

Rehab<br />

Consultant/Contractors:<br />

Bid specification developed by staff.<br />

Manhole raising and rehab to be performed<br />

by Hinterland Group.<br />

Project Description:<br />

The Poinciana’s WWTP#3 collection system<br />

basin was surveyed to identify all buried and<br />

below grade manholes. These manholes<br />

contribute to the Inflow problem in this area<br />

and complicate assessment and operational<br />

maintenance activities. This project will 1)<br />

raise all manholes greater than 8” below<br />

grade and 2) raise all manholes located in<br />

swales or other areas prone to flooding.<br />

Manholes located in the WWTP#2 collection<br />

systems meeting the same criteria as above<br />

are included in this scope.<br />

Consultant/Contractors:<br />

Bid specification for manhole repairs is being<br />

developed by Engineering Technologies<br />

(ET).<br />

Project Description:<br />

Complete rehab and repairs to specified<br />

areas of the gravity sewer collection system.<br />

1. Four high priority areas identified by Field<br />

Services (S. Poinciana & Mercantile,<br />

Lakeside & Boggy Creek, N Old Lake<br />

Wilson & 192, and Formosa Gardens &<br />

192). Repair infiltration and line 67<br />

manholes.<br />

2. The 2010 collection system condition<br />

assessments identified the following for<br />

rehab:<br />

Repair infiltration sources in<br />

manholes (171 manholes)<br />

Rehab or replace manholes with<br />

surface corrosion significant enough<br />

to affect structural integrity (27<br />

All construction activities<br />

including: raising manholes<br />

to grade (224), leak<br />

stoppage (27) and lining<br />

manholes (23) have been<br />

completed.<br />

Final pay application<br />

processed.<br />

Project closed out.<br />

Field inspections completed<br />

by ET on the four areas<br />

identified by Field Services.<br />

Staff has reviewed and<br />

accepted<br />

ET’s<br />

recommendations.<br />

Asset defect and location<br />

information has been<br />

provided to ET for inclusion<br />

in the bid specification.<br />

Staff has completed an initial<br />

review of the bid<br />

specification and has met<br />

with the consultant to provide<br />

feedback.<br />

ET provided a revised Bid<br />

Specification to staff for<br />

review 7/13/12.<br />

Staff review and addition<br />

13<br />

Final pay application<br />

processed.<br />

Project closed out.<br />

Revised Bid Specification<br />

received from ET on 7/13/12.<br />

Total project cost<br />

$201,307.20 resulting<br />

in a surplus of<br />

approximately<br />

$30,0000<br />

Manhole rehab and<br />

repair estimate -<br />

$893,560<br />

Gravity Main rehab<br />

and repair estimate -<br />

$935,000 (based on<br />

replacement cost)<br />

Raise Manholes:<br />

Proposals Due<br />

7/7/11 - Completed<br />

Select apparent low<br />

bidder<br />

7/17/11 - Completed<br />

Obtain Board’s<br />

approval to proceed<br />

7/27/11 - Completed<br />

Field Data Collection<br />

10/<strong>25</strong>/11 - Completed<br />

Raise Manholes<br />

2/28/12 - Completed<br />

Project Close-out<br />

6/21/12 - Completed<br />

Repair/Rehab<br />

Manholes:<br />

Consultant to develop<br />

bid specification for<br />

Repair and Rehab<br />

8/2/12<br />

Advertise Bid<br />

8/3/12<br />

Select apparent low<br />

bidder<br />

9/4/12<br />

Obtain Board’s<br />

approval to proceed<br />

9/26/12