Major Project Summaries 07.<strong>25</strong>.12<br />
Project Project Status Progress from Cost Schedule<br />
Name Description Previous Report Estimate<br />
manholes)<br />
Repair structural defects and<br />
significant infiltration sources found<br />
in gravity mains (13,617 LF of<br />
gravity main).<br />
revisions (as necessary) will<br />
be completed to permit a<br />
8/3/12 advertise date.<br />
TN<br />
ET will inspect these areas as necessary and<br />
develop a bid specification.<br />