Major Project Summaries 07.<strong>25</strong>.12<br />
Project Project Status Progress from Cost Schedule<br />
Name Description Previous Report Estimate<br />
Lift Station<br />
Rehab 2011<br />
centers. This project will allow SBWRF to<br />
meet the Class 1 requirement.<br />
The backup power supply will be provided via<br />
two generators connected via paralleling<br />
switchgear. The paralleling switchgear<br />
allows the generators to operate as a single<br />
unit with the added ability to shed electrical<br />
loads if one of the generators was<br />
incapacitated. Two generators will be<br />
installed at this time with a third future<br />
generator installed as power demand<br />
increases with completion of future plant<br />
expansion projects.<br />
Engineer: In-House<br />
Contractor: In-House<br />
Eight lift stations have been prioritized for<br />
rehabilitation due to existing conditions of the<br />
various components at each station. This<br />
project will be designed and constructed in 2<br />
phases:<br />
Phase I: LS-64, LS-5B, LS-20B<br />
Phase II:LS-76, LS-1<strong>25</strong>, LS-15, LS-17P,LS-<br />
18P<br />
Rehabilitation efforts to include pump &<br />
piping replacement, wetwell repair & coating,<br />
electrical upgrades, SCADA upgrades,<br />
fencing improvements, and other<br />
rehabilitation efforts as required at each<br />
station.<br />
Phase I:<br />
LS 5B construction is<br />
underway. The Startup is<br />
scheduled for <strong>July</strong> 23, <strong>2012</strong>.<br />
LS 20B and LS 64<br />
construction have not been<br />
initiated yet.<br />
Phase II:<br />
Draw down test on all Phase<br />
II lift stations has been<br />
completed. Survey has been<br />
completed for all lift stations.<br />
Hydraulic modeling and 60%<br />
design is underway.<br />
Phase I:<br />
LS 5B: Pumps, piping, top<br />
slab have been installed;<br />
wetwell has been coated.<br />
Electrical construction is<br />
underway.<br />
Phase II:<br />
60% Design has been<br />
initiated.<br />
$64,130 (KUA<br />
Services, by <strong>Toho</strong>)<br />
$3,724,024 (GMP,<br />
including Owner’s<br />
Contingency and<br />
CMAR Construction<br />
Phase Services)<br />
$275,448 (Lab<br />
Electrical Feeder<br />
Change Order)<br />
The pre-design<br />
budget is $1,000,000.<br />
LS 5B Pump/control<br />
panel bid = $29,992<br />
LS 20B Pump/control<br />
panel bid = $<strong>25</strong>,996<br />
LS 64 Pump/control<br />
panel = $23,<strong>25</strong>4<br />
LS 5B Electrical bid =<br />
$23,721<br />
LS 20B Electrical bid<br />
= $24,717<br />
LS 64 Electrical =<br />
$23,721<br />
LS 5B Piping/valve<br />
bid = $10,000<br />
LS 20B Piping/valve<br />
bid = $15,300<br />
Phase I construction<br />
schedule:<br />
LS 5B:<br />
5/12/<strong>2012</strong> to 8/03/<strong>2012</strong>,<br />
on schedule.<br />
LS 20B:<br />
8/6/<strong>2012</strong> to 10/19/<strong>2012</strong><br />
LS 64:<br />
10/22/<strong>2012</strong> to 1/4/2013<br />
(tentative schedule)<br />
Phase II:<br />
Design and bid is<br />
scheduled to be<br />
completed<br />
in<br />
September <strong>2012</strong> and<br />
construction is<br />
scheduled to be<br />
completed in <strong>July</strong> 2013.<br />
GE/LZ<br />
LS 64 Piping/valve<br />
bid = $10,000<br />
4