<strong>Final</strong> <strong>Re</strong><strong>port</strong> • June 2013<br />

VICTORIA PARK COMPREHENSIVE MASTER PLAN<br />

5.9<br />

Waterfront Matrix<br />

Zone Facility Intention Timeframe Objective Task Frequency<br />

Waterfront<br />

Boardwalk<br />

Upgrade existing boardwalk to a multimodal<br />

facility.<br />

Raise boardwalk level along with sea wall<br />

improvements<br />

Widen boardwalk cross section to 4.0 - 5.0 metres<br />

Short Term<br />

Investment Upgrade surfacing from wood to hard surface<br />

Medium - Long<br />

Term<br />

Investment<br />

Explore the feasibility <strong>of</strong> permeable paving<br />

Raise height and improve construction <strong>of</strong> sea wall<br />

Construct 4.0 - 5.0 m wide boardwalk<br />

Narrow travel lanes to 3.2m width<br />

Increase medians and add other traffic calming measures<br />

<strong>Park</strong> Road Convert to an internal park carriageway. Short Term Investment<br />

Change surfacing at key gateways & crossings<br />

Look -<strong>of</strong>fs & Water Access<br />

Sea wall<br />

Create a series <strong>of</strong> safe water access points<br />

and look-<strong>of</strong>fs<br />

Maintain the existing sea wall<br />

Upgrade the sea wall to account for sea<br />

level rise & major storm events.<br />

<strong>Re</strong>duce speed limit.<br />

<strong>Re</strong>move civic street name<br />

Medium Term Investment Promote enhanced access and connection to the water.<br />

Ongoing<br />

<strong>Re</strong>gular<br />

Maintenance<br />

Inspect the sea wall for damage, top up armour stone as<br />

required.<br />

Long Term Investment Upgrade the height and construction <strong>of</strong> the existing sea wall.<br />

Annually and after any major events.<br />

5.10<br />

Heritage & Cultural Matrix<br />

Zone Facility Intention Timeframe Objective Task Frequency<br />

Heritage &<br />

Culture<br />

Fort Edward Battery<br />

Memorials & Public Art<br />

Signage and Interpretation<br />

Maintain character and quality <strong>of</strong> Fort<br />

Inspect artifacts and installations for damage and wear. Bi-annually<br />

Ongoing<br />

Edward’s historic assets<br />

<strong>Re</strong>gular<br />

<strong>Re</strong>move graffiti and vandalism<br />

Within 24 hours <strong>of</strong> incident.<br />

Maintain existing interpretive signage Ongoing<br />

Maintenance Inspect panels, footings, and base for wear. Annually<br />

<strong>Re</strong>pair as required.<br />

As needed<br />

Update and add to existing interpretive Medium Term<br />

Add to the quality and quantity <strong>of</strong> the interpretation at Fort<br />

Investment<br />

signage<br />

Edward<br />

Maintain existing memorials and public art<br />

<strong>Re</strong>gular<br />

Inspect memorials for damage and wear.<br />

Bi-annually<br />

Ongoing<br />

installations.<br />

Maintenance <strong>Re</strong>move graffiti and vandalism Within 24 hours <strong>of</strong> incident.<br />

Maintain existing memorials and public art<br />

installations.<br />

<strong>Re</strong>gular<br />

Inspect memorials for damage and wear.<br />

Bi-annually in the fall and spring.<br />

Ongoing<br />

Maintenance <strong>Re</strong>move graffiti and vandalism Within 24 hours <strong>of</strong> incident.<br />

Install new signage Short Term Investment Install new park signage, as required<br />