Victoria_Park_Re port Final.pdf - City of Charlottetown
Victoria_Park_Re port Final.pdf - City of Charlottetown
Victoria_Park_Re port Final.pdf - City of Charlottetown
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Final</strong> <strong>Re</strong><strong>port</strong> • June 2013<br />
VICTORIA PARK COMPREHENSIVE MASTER PLAN<br />
5.11<br />
<strong>Park</strong> - Wide Operations Matrix<br />
Zone Facility Intention Timeframe Objective Task Frequency<br />
Evaluate park lighting needs, and eliminate surplus lighting / reduce excess lighting levels,<br />
in keeping with best practices <strong>of</strong> dark sky compliance.<br />
Complete a park wide lighting audit.<br />
Implement recommendations over time.<br />
Inspect lighting<br />
annually and as required.<br />
<strong>Park</strong> Services<br />
Maintain water, sewer and electrical to key park<br />
areas.<br />
Ongoing<br />
<strong>Re</strong>gular<br />
Maintenance<br />
Inspect park sewer infrastructure.<br />
Inspect annually. <strong>Re</strong>commend annual clean-out <strong>of</strong> catch basins & manholes, and as<br />
required.<br />
Ensure positive drainage <strong>of</strong> stormwater in park, to avoid unnecessary flooding<br />
Ongoing. In areas <strong>of</strong> challenging drainage, consider the installation <strong>of</strong> french drains.<br />
Evaluate park lighting needs, and eliminate surplus lighting / reduce excess lighting levels,<br />
in keeping with best practices <strong>of</strong> dark sky compliance.<br />
Complete a park wide lighting audit.<br />
Implement recommendations over time.<br />
<strong>Park</strong>-Wide<br />
Maintain existing buildings<br />
Ongoing<br />
<strong>Re</strong>gular<br />
Maintenance<br />
Inspect and maintain existing buildings as required.<br />
Ongoing.<br />
Buildings<br />
Construct a new maintenance building, adjacent to<br />
the Brighton road main park entrance<br />
Medium Term<br />
Investment<br />
Construct a new consolidated maintenance area, adjacent to Brighton Road. Space should<br />
be large enough to store equipment dedicated to <strong>Victoria</strong> <strong>Park</strong>, as well as provide <strong>of</strong>fice<br />
space & staff areas for operations staff. <strong>Re</strong>locate material stock piles.<br />
Avoid the construction <strong>of</strong> new buildings<br />
Ongoing<br />
Unless clearly needed (and besides the new maintenance building), carefully evaluate the<br />
need for future or expanded buildings in <strong>Victoria</strong> <strong>Park</strong>.<br />
Signage<br />
<strong>Re</strong>place existing signage over time with new<br />
signage family<br />
Ongoing<br />
<strong>Re</strong>gular<br />
Maintenance<br />
Investment<br />
Inspect signage.<br />
As new signs are required, replace with standard from the new signage family.<br />
Annually and as required.<br />
63