13.01.2015 Views

Installation and Operating Instructions - Crompton Instruments

Installation and Operating Instructions - Crompton Instruments

Installation and Operating Instructions - Crompton Instruments

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Testing the function of Relay 3<br />

With no measuring signal input, relay 3<br />

should not be tripped.<br />

Connect a 20 Amp AC constant current<br />

source through any phase. Switch on the<br />

current, <strong>and</strong> start a timer. After 2.4<br />

seconds, the relay will trip, <strong>and</strong> the<br />

51# symbol will appear in the relay<br />

status display.<br />

If the current source is not constant, the<br />

trip time will be continuously recalculated<br />

by SPR, <strong>and</strong> will vary in<br />

proportion to that current.<br />

If precision timing equipment is not<br />

available, try injecting a smaller<br />

overload, for example 8 Amps (which is<br />

2x the setpoint) When the time dial<br />

setting is set to approximately 10<br />

seconds, the trip time will be ten<br />

seconds. (calculation gives ideal time dial<br />

setting of 9.8 for a 10 second trip time)<br />

50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!