Installation and Operating Instructions - Crompton Instruments
Installation and Operating Instructions - Crompton Instruments
Installation and Operating Instructions - Crompton Instruments
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Testing the function of Relay 3<br />
With no measuring signal input, relay 3<br />
should not be tripped.<br />
Connect a 20 Amp AC constant current<br />
source through any phase. Switch on the<br />
current, <strong>and</strong> start a timer. After 2.4<br />
seconds, the relay will trip, <strong>and</strong> the<br />
51# symbol will appear in the relay<br />
status display.<br />
If the current source is not constant, the<br />
trip time will be continuously recalculated<br />
by SPR, <strong>and</strong> will vary in<br />
proportion to that current.<br />
If precision timing equipment is not<br />
available, try injecting a smaller<br />
overload, for example 8 Amps (which is<br />
2x the setpoint) When the time dial<br />
setting is set to approximately 10<br />
seconds, the trip time will be ten<br />
seconds. (calculation gives ideal time dial<br />
setting of 9.8 for a 10 second trip time)<br />
50