13.01.2015 Views

Installation and Operating Instructions - Crompton Instruments

Installation and Operating Instructions - Crompton Instruments

Installation and Operating Instructions - Crompton Instruments

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COPYRIGHT<br />

The copyright in this document (including all information contained therein) is owned by<br />

CROMPTON INSTRUMENTS <strong>and</strong> must be used solely for the owner’s specified purposes.<br />

This document must not be copied or reproduced, nor divulged in whole or in part, without the<br />

owner’s written consent.<br />

WARNINGS<br />

1 The System Protection Relay is not intended to be used as a sole means of<br />

protection - good engineering practice dictates that any critical function be<br />

protected by two independent <strong>and</strong> diverse devices.<br />

2 In the interest of safety <strong>and</strong> functionality this product must be installed by<br />

qualified properly trained personnel abiding by local regulations.<br />

CAUTIONS<br />

3 Voltages dangerous to human life are present at some of the terminal<br />

connections of this unit. Ensure that all supplies are de-energised before<br />

attempting any connection or disconnection. External installations must be<br />

sufficient to protect human life <strong>and</strong> equipment under fault conditions.<br />

1 These products do not have internal fuses, therefore external fuses must<br />

be used for protection for safety under fault conditions.<br />

2 The current inputs of these products are designed for connection into<br />

systems via current transformers only.<br />

3 Never open-circuit the secondary winding of a current transformer. Always<br />

ensure that the power is disconnected before separating the current<br />

connector from SPR.<br />

4 Internal self-checking circuitry (watchdog) continuously monitors the<br />

operational state of the SPR, <strong>and</strong> operates a dedicated relay contact. If the<br />

Watchdog relay is in the ‘failed’ condition (not energised) all other relay<br />

contacts are forced to the de-energised condition.<br />

5 Operation outside specified limits may cause permanent damage or<br />

temporary disruption. For the latter case, normal operation may be<br />

restored by temporary disconnection of the auxiliary supply.<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!