Installation Instructions<br />
’Ventilation screw on the heat exchanger.<br />
10<br />
D.4.4<br />
Filling and de-aerating of the internal cooling water circuit<br />
Fill up the external cooling water expansion<br />
tank with cooling water<br />
Note: "consider maximum level" according<br />
to marking! The cover on the external cooling<br />
water container must remain provisionally<br />
opened (all other catches are<br />
however now closed!).<br />
Start of the generator<br />
After filling the generator must be started.<br />
During this first phase of start-up, the<br />
generator may not be loaded. Switch the<br />
generator off after maximally 2 minutes of period of operation again!<br />
Note!<br />
The external cooling water expansion tank may be filled in the maximum filling in the cold<br />
condition only up to the "max" - marking.<br />
First de-aerating<br />
The cooling water circuit of the generator must be de-aerated now by multiple repeating of the deaerating<br />
procedure. During the entire procedure the external cooling water expansion tank<br />
remains opened (i.e. the cap must be removed).<br />
After the first stopping of the the generator wait about one minute until the air in the cooling water<br />
can be drop off and raise to the highest point (ventilation point).<br />
Now open all three ventilation points one after another as long as cooling water exit. Then the closure<br />
screw must be closed immediately. (Turn on only lightly to treat the thread.)<br />
Pay attention that the external cooling water expansion tank is filled with enough cooling water<br />
during the de-aerating. (If necessary refill over and over.)<br />
One de-aerating step will be last as a rule max. 2 minutes and following steps contained:<br />
1. The generator runs approx. 1 minute.<br />
2. Stop the generator.<br />
3. Hold on one minute for drop of air.<br />
4. The collected air is led out over the two de-aeration points.<br />
The ahead described de-aerating process must be repeated as long as after the stopping and<br />
drop off air none air exit out of the de-aerating ports, only cooling water.<br />