Installation Instructions<br />

’Ventilation screw on the heat exchanger.<br />

10<br />

D.4.4<br />

Filling and de-aerating of the internal cooling water circuit<br />

Fill up the external cooling water expansion<br />

tank with cooling water<br />

Note: "consider maximum level" according<br />

to marking! The cover on the external cooling<br />

water container must remain provisionally<br />

opened (all other catches are<br />

however now closed!).<br />

Start of the generator<br />

After filling the generator must be started.<br />

During this first phase of start-up, the<br />

generator may not be loaded. Switch the<br />

generator off after maximally 2 minutes of period of operation again!<br />

Note!<br />

The external cooling water expansion tank may be filled in the maximum filling in the cold<br />

condition only up to the "max" - marking.<br />

First de-aerating<br />

The cooling water circuit of the generator must be de-aerated now by multiple repeating of the deaerating<br />

procedure. During the entire procedure the external cooling water expansion tank<br />

remains opened (i.e. the cap must be removed).<br />

After the first stopping of the the generator wait about one minute until the air in the cooling water<br />

can be drop off and raise to the highest point (ventilation point).<br />

Now open all three ventilation points one after another as long as cooling water exit. Then the closure<br />

screw must be closed immediately. (Turn on only lightly to treat the thread.)<br />

Pay attention that the external cooling water expansion tank is filled with enough cooling water<br />

during the de-aerating. (If necessary refill over and over.)<br />

One de-aerating step will be last as a rule max. 2 minutes and following steps contained:<br />

1. The generator runs approx. 1 minute.<br />

2. Stop the generator.<br />

3. Hold on one minute for drop of air.<br />

4. The collected air is led out over the two de-aeration points.<br />

The ahead described de-aerating process must be repeated as long as after the stopping and<br />

drop off air none air exit out of the de-aerating ports, only cooling water.<br />

Page 46 <strong>PMS</strong>_<strong>4500</strong>_<strong>FCB</strong>_manual.V02 - Chapter D: Installation Instructions 15.7.05