Installation Instructions<br />

D.8.2<br />

Installation AC-Box / distribution panel separate connected<br />

1. Generator<br />

2. Starter battery<br />

3. AC-Control box<br />

4. Distribustion box<br />

5. Remote control panel<br />

6. Fuel pump<br />

All electrical safety installations have to be made on board.<br />

A power source selector switch must be installed between the generator (or if applicable,<br />

AC-Control box) and the ship´s electrical supply system. This switch must used to ensure<br />

that all AC consumers can be switched off at once. This switch should also be installed to<br />

keep the generator and shore (grid) power systems separate.<br />

A 3-way cam-type switch should be used. This switch basic positions:<br />

"Shore power" - "OFF" - "Generator". If an (DC-AC) inverter is used, a<br />

fourth position will be required.<br />

0. OFF<br />

I. Generator<br />

II. Shore power connection<br />

III. Inverter<br />

Page 58 <strong>PMS</strong>_<strong>4500</strong>_<strong>FCB</strong>_manual.V02 - Chapter D: Installation Instructions 15.7.05