Installation Instructions<br />
The Panda generators <strong>4500</strong> SCB/<strong>FCB</strong><br />
are equipped with two various DC-relays<br />
and one electrical fuse, which can be<br />
found at the terminal strip. The various<br />
relays and fuse have the following tasks<br />
(also see the DC circuit diagram):<br />
1. Starter relay K1<br />
2. Fuel pump start relay K3<br />
3. Electrical fuse (25A)<br />
1 2 3<br />
All Panda generators are equipped with<br />
an independent 12V-DC starter motor.<br />
The connecting lines cross-section from<br />
the battery to the DC system should measure<br />
25mm².<br />
1. Solenoid switch for starter motor<br />
2. Starter motor<br />
2<br />
1<br />
D.7.2<br />
Connection of the remote control panel<br />
As standard a 7 core connection-cable,<br />
7m long, is included in the supply. Cores<br />
are numbered from 1 to 7. The control<br />
cables are securely connected to the genset.<br />
On the back of the control panel there<br />
are terminals numbered from 1 - 7. Connect<br />
the cores of the control-cable in<br />
respective order.<br />
Please ensure that the remote control<br />
panel is installed in a protected, dry and<br />
easily accessible place.<br />