Installation Instructions<br />

The Panda generators <strong>4500</strong> SCB/<strong>FCB</strong><br />

are equipped with two various DC-relays<br />

and one electrical fuse, which can be<br />

found at the terminal strip. The various<br />

relays and fuse have the following tasks<br />

(also see the DC circuit diagram):<br />

1. Starter relay K1<br />

2. Fuel pump start relay K3<br />

3. Electrical fuse (25A)<br />

1 2 3<br />

All Panda generators are equipped with<br />

an independent 12V-DC starter motor.<br />

The connecting lines cross-section from<br />

the battery to the DC system should measure<br />

25mm².<br />

1. Solenoid switch for starter motor<br />

2. Starter motor<br />

2<br />

1<br />

D.7.2<br />

Connection of the remote control panel<br />

As standard a 7 core connection-cable,<br />

7m long, is included in the supply. Cores<br />

are numbered from 1 to 7. The control<br />

cables are securely connected to the genset.<br />

On the back of the control panel there<br />

are terminals numbered from 1 - 7. Connect<br />

the cores of the control-cable in<br />

respective order.<br />

Please ensure that the remote control<br />

panel is installed in a protected, dry and<br />

easily accessible place.<br />