PMS 4500 FCB Manual - Ysebaert
PMS 4500 FCB Manual - Ysebaert
PMS 4500 FCB Manual - Ysebaert
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table of contents<br />
A Mode of Operation of the Generator ................................................................................5<br />
A.1 Mode of operation of operating surveillance ...................................................................... 5<br />
A.1.1 Regulation of the generator voltage by the VCS ....................................................................... 7<br />
A.1.2 Overloading of engine during longer operation ......................................................................... 7<br />
A.2 Operation of electric motors with high starting current .................................................... 7<br />
A.2.1 General references.................................................................................................................... 7<br />
A.2.2 Compensation of 1 phases engines .......................................................................................... 8<br />
A.2.3 Compensation of 3 phases engines .......................................................................................... 8<br />
A.3 Operation of the generator with additional units ............................................................... 8<br />
A.3.1 General references.................................................................................................................... 8<br />
A.4 Operation of the generator with HTG generator ................................................................. 9<br />
A.4.1 General references.................................................................................................................... 9<br />
A.5 Operation of generator with installation under the waterline ........................................... 9<br />
A.5.1 Control of the ventilation valve ................................................................................................ 10<br />
A.6 Operation of generator with installation over the waterline ............................................ 11<br />
B Maintenance Instructions ................................................................................................13<br />
B.1 General maintenance instructions .................................................................................... 13<br />
B.1.1 Checks before starting ............................................................................................................ 13<br />
B.1.2 Hose elements and rubber formed component in the sound cover......................................... 13<br />
B.2 Oil circuit maintenance ....................................................................................................... 13<br />
B.3 Execution of an oil change ................................................................................................. 14<br />
B.3.1 De-aerating the fuel system .................................................................................................... 16<br />
B.3.2 Exchange of the fuel filter........................................................................................................ 16<br />
B.4 Checking the water separator in the fuel supply ............................................................. 17<br />
B.4.1 Exchange the air filter mat....................................................................................................... 17<br />
B.5 De-aerating of the coolant circuit / freshwater ................................................................. 18<br />
B.5.1 Draining the coolant ................................................................................................................ 20<br />
B.5.2 Exchange of the toothed-belt for the internal cooling water pump .......................................... 20<br />
B.6 The raw water circuit ........................................................................................................... 21<br />
B.6.1 Clean raw water filter............................................................................................................... 21<br />
B.7 Causes with frequent impeller waste ................................................................................ 22<br />
B.7.1 Exchange of the impeller......................................................................................................... 22<br />
B.8 Coolant connection block at generator housing .............................................................. 24<br />
B.9 Conservation at longer operation interruption ................................................................. 25<br />
B.9.1 Measures on preparation of the winter storage....................................................................... 25<br />
B.9.2 Initiation at spring .................................................................................................................... 26<br />
C Generator Failure .............................................................................................................27<br />
C.1 Tools and measuring instruments ..................................................................................... 27<br />
C.2 Overloading the Generator ................................................................................................. 27<br />
C.2.1 Monitoring the Generator Voltage ........................................................................................... 28<br />
C.2.2 Automatic Voltage Monitoring and Auto-Shut Down ............................................................... 28<br />
15.7.05 <strong>PMS</strong>_<strong>4500</strong>_<strong>FCB</strong>_manual.V02 - Table of contents - Page 1