23.01.2015 Views

Raport Roczny Annual Report 2010 - Tauron

Raport Roczny Annual Report 2010 - Tauron

Raport Roczny Annual Report 2010 - Tauron

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TAURON Polska Energia | <strong>Raport</strong> <strong>Roczny</strong> | <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong><br />

Glossary<br />

<br />

<br />

<br />

target price – price that, according to analysts, will be<br />

reached within specific time.<br />

distribution – transportation of electricity via distribution<br />

grids to end users<br />

dividend – part of the net profit to be distributed among<br />

shareholders.<br />

<br />

<br />

<br />

polygeneration - simultaneous generation of electricity<br />

and liquid fuels. Fuels are produced indirectly from synthetic<br />

gas obtained as a result of hard coal gasification<br />

kWh – kilowatt hour, amount of electricity consumed<br />

for an hour by a 1000 W device<br />

MWe – electric power megawatt<br />

<br />

advertising value equivalent – ratio of a sponsor’s outlays<br />

to the valuation (rating) of media coverage achieved.<br />

It is one of the metrics used to measure effectiveness of<br />

sponsoring activities<br />

combined heat and power plant (CHP) – a plant that simultaneously<br />

generates electricity and heat<br />

<br />

<br />

<br />

MWt – thermal megawatt (of heat)<br />

RES – renewable energy sources<br />

rating – an independent assessment of credit risk made<br />

by specialized rating agencies with respect to an entity<br />

that takes on a loan.<br />

<br />

LTC – long term power purchase contracts in the energy<br />

sector. They were introduced as a collateral for banks<br />

that were financing large upgrade investment projects<br />

in the energy sector. They defined how much electricity<br />

and at what prices was to be purchased from the given<br />

power plant by Polskie Sieci Elektroenergetyczne (TSO).<br />

Long term contracts were terminated in 2007 and the<br />

generators covered thereby were granted the right to<br />

cover the so-called “stranded costs”, i.e. capital expenditures<br />

incurred, that will be covered with revenue following<br />

the termination of such contracts.<br />

<br />

<br />

<br />

<br />

”BBB” rating – a satisfactory ability of an entity to service<br />

its liabilities.<br />

spot market – sale with a payment date of up to two<br />

days<br />

toe – ton of oil equivalent, thermal equivalent of one<br />

metric ton of crude oil with the heating value equal to<br />

10 thou. kcal/kg<br />

TWh – terawatt hour, a billion kilowatt hours (kWh)<br />

<br />

mWIG40 – index that groups 40 mid size companies listed<br />

on the WSE.<br />

cogeneration – simultaneous generation of electricity<br />

and heat at a combined heat and power plant (CHP)<br />

<br />

<br />

Mtoe – million tons of oil equivalent<br />

WIG20 – index that groups 20 largest companies listed<br />

on the WSE (based on the highest free float market capitalization<br />

and the highest trading volume).<br />

71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!