24.01.2015 Views

Annex I Description of Work (April 2007) - ENEN Association

Annex I Description of Work (April 2007) - ENEN Association

Annex I Description of Work (April 2007) - ENEN Association

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Euratom 2005-6 – Fixed deadline<br />

Coordination Actions<br />

<strong>ENEN</strong>-II<br />

Appendix D – Contractual Documents and Reporting under FP 6<br />

1. Introduction<br />

Reporting Procedures for a Coordination Action<br />

The Contract and its <strong>Annex</strong>es set out the main reporting requirements <strong>of</strong> the Consortium towards<br />

the Commission. These are summarised here to provide a readily accessible check list for both the<br />

Consortium and the Commission services. In addition, a number <strong>of</strong> other reports/documents are<br />

identified which should be furnished at the times indicated to enable effective and timely<br />

monitoring <strong>of</strong> project progress by the Commission services. A brief description <strong>of</strong> the nature <strong>of</strong> the<br />

respective reports/documents is also provided.<br />

Report/Document<br />

Agendas <strong>of</strong> meetings concerned with<br />

management <strong>of</strong> the project 32<br />

Minutes <strong>of</strong> meetings concerned with<br />

management <strong>of</strong> the project 1<br />

Statement on signature <strong>of</strong> the Consortium<br />

Agreement<br />

Project Presentation<br />

Communication Action Plan<br />

Periodic Management / Activity Report,<br />

including<br />

- plan for using and disseminating <strong>of</strong><br />

knowledge<br />

Deadline<br />

2 weeks in advance <strong>of</strong> meeting<br />

1 month after meeting<br />

Ideally before contract start and not later than 3<br />

months thereafter<br />

Within 3 months <strong>of</strong> contract start<br />

Within 6 months <strong>of</strong> contract start<br />

Every 12 months after contract start (ie, at 12,<br />

24…. months) 2<br />

Interim Management Report Every 6 months after contract start (ie, 6, 18,<br />

30…. months) 2<br />

Mid Term Assessment Report At mid-point <strong>of</strong> the contract (ie, at 18 months) 2<br />

Final Reports<br />

At end <strong>of</strong> project (ie, at 36 months) 2<br />

- final management report<br />

- final activity report<br />

- impact <strong>of</strong> gender action plan<br />

Financial statements Every 12 months after contract start (ie, at 12,<br />

24 and 36 months)<br />

Publications/conferences/press Releases 3 1 months before publication<br />

32 To be strictly limited to meetings concerned with management <strong>of</strong> the project, eg, meetings <strong>of</strong> the project management<br />

team, meetings <strong>of</strong> the co-ordinator with work package leaders, meetings <strong>of</strong> advisory/steering committees, meetings for<br />

evaluation/selection <strong>of</strong> contractors after open calls, etc<br />

2 Report to be delivered within 45 days <strong>of</strong> the end <strong>of</strong> the respective reporting period<br />

3 Limited to those which may have social, economic and/or political impact or could trigger significant media interest<br />

<strong>Annex</strong> I <strong>Description</strong> <strong>of</strong> <strong>Work</strong> - page 120 <strong>of</strong> 124

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!