24.01.2015 Views

Annex I Description of Work (April 2007) - ENEN Association

Annex I Description of Work (April 2007) - ENEN Association

Annex I Description of Work (April 2007) - ENEN Association

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Euratom 2005-6 – Fixed deadline<br />

Coordination Actions<br />

<strong>ENEN</strong>-II<br />

in the 12 th month. A final project meeting will be held in the 24 th month (two days). Those meetings<br />

require the presence <strong>of</strong> representatives <strong>of</strong> all <strong>ENEN</strong> members, involved in the project, as well as the<br />

external partners. They will normally be preceded by a project Management Committee meeting<br />

(two days) to prepare the meeting, to discuss and evaluate the progress, to allocate resources and to<br />

settle financial matters. <strong>Work</strong> Package leaders will organise meetings for the <strong>ENEN</strong> members and<br />

external partners involved in the different work packages, as needed with a minimum <strong>of</strong> three<br />

meetings <strong>of</strong> two days over the duration <strong>of</strong> the project. Each <strong>ENEN</strong> member involved in the project<br />

and all external partners have the responsibility to participate to appropriate events for<br />

disseminating the results <strong>of</strong> the project and the knowledge acquired.<br />

The tables on the following pages show the distribution <strong>of</strong> the efforts and resources over the<br />

contractors and selected <strong>ENEN</strong> members, according to the <strong>Work</strong> packages. The selected <strong>ENEN</strong><br />

members are dedicated to specific tasks and indicated here for a better transparency in the project<br />

preparation sequence. The tables provide a break-down <strong>of</strong> the efforts and resources over the <strong>ENEN</strong><br />

<strong>Work</strong>ing Committees. A complete overview <strong>of</strong> the efforts and resources <strong>of</strong> the contractors and the<br />

<strong>ENEN</strong> members involved in the different <strong>Work</strong> packages as third parties is provided in the<br />

following tables.<br />

<strong>Annex</strong> I <strong>Description</strong> <strong>of</strong> <strong>Work</strong> - page 55 <strong>of</strong> 124

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!