Euratom 2005-6 – Fixed deadline Coordination Actions<br />

<strong>ENEN</strong>-II<br />

7.3 Graphical Presentation <strong>of</strong> <strong>Work</strong> Packages<br />

The <strong>Work</strong> Packages are relatively independent from each other. The individual tasks within the <strong>Work</strong> Packages and their interrelations are represented<br />

in the planning and the time schedule graphs. The time schedule is more dependent on the availability <strong>of</strong> resources with the different partners than on<br />

the availability <strong>of</strong> specific deliverables from different <strong>Work</strong> packages. A graphical presentation <strong>of</strong> the <strong>Work</strong> Packages brings therefore not much<br />

additional information, which would not already be available in the paragraphs 7.2, 81 and 8.3.<br />