Annex I Description of Work (April 2007) - ENEN Association
Annex I Description of Work (April 2007) - ENEN Association
Annex I Description of Work (April 2007) - ENEN Association
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Euratom 2005-6 – Fixed deadline<br />
Coordination Actions<br />
<strong>ENEN</strong>-II<br />
respect to other databases.<br />
- D.5.2.1 Contact points and dynamic database on nuclear education courses and<br />
pr<strong>of</strong>essional training programmes.<br />
- D.5.2.2 Report on an evaluation <strong>of</strong> the response and correctness <strong>of</strong> the information in the<br />
database.<br />
- D.5.3 Products <strong>of</strong> relevance to the European Nuclear Higher Education Area society in<br />
general: one textbook, two distance/E-learning modules and one multimedia<br />
presentation.<br />
- D.5.4 Dissemination <strong>of</strong> instruments and tools for promoting the selection <strong>of</strong> a career<br />
related to nuclear applications at secondary school and bachelor level.<br />
- D.5.5 Quality assurance report on <strong>Work</strong> Package 5 deliverables.<br />
Milestones 27 and expected result<br />
Decisions on web site structure and operational features.<br />
Web site and communication system integrated.<br />
Selection and specification <strong>of</strong> <strong>ENEN</strong> products (books, distance/E-learning modules,<br />
multimedia presentations,..)<br />
27 Milestones are control points at which decisions are needed; for example concerning which <strong>of</strong> several technologies<br />
will be adopted as the basis for the next phase <strong>of</strong> the project.<br />
<strong>Annex</strong> I <strong>Description</strong> <strong>of</strong> <strong>Work</strong> - page 49 <strong>of</strong> 124