24.01.2015 Views

Annex I Description of Work (April 2007) - ENEN Association

Annex I Description of Work (April 2007) - ENEN Association

Annex I Description of Work (April 2007) - ENEN Association

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Euratom 2005-6 – Fixed deadline<br />

Coordination Actions<br />

<strong>ENEN</strong>-II<br />

5. Financial Statements<br />

Form C, as set out in <strong>Annex</strong> VI <strong>of</strong> the contract should be used for submitting financial statements<br />

by each contractor for each reporting period. The coordinator should also provide the summary<br />

financial report consolidating the claimed costs <strong>of</strong> all the contractors in an aggregate form.<br />

6. Mode <strong>of</strong> Delivery <strong>of</strong> Reports<br />

Periodic Management Reports, Periodic Activity Reports and all Final Reports should be submitted<br />

by electronic means together with one paper copy (delivery by registered mail). Statement on<br />

signature <strong>of</strong> Consortium Agreement and all Financial Statements should be submitted with original<br />

signatures on paper (delivery by registered mail). Other reports including deliverables and technical<br />

reports can be submitted by electronic means only<br />

6.1 Document unique numbering<br />

A document numbering system will be used so that all project documents will have a unique<br />

number and the type <strong>of</strong> document can be identified, e.g. contractual deliverables from the<br />

consortium or project documents to be issued to the Commission. The system proposed is as<br />

follows:<br />

- <strong>ENEN</strong>-II-S/T-WP n-m for contractual deliverables <strong>of</strong> scientific/technical interest (where “n”<br />

means the WP number and “m” follows simply the chronological order within WP n)<br />

- <strong>ENEN</strong>-II -A/F-m for contractual deliverables <strong>of</strong> administrative/financial interest as indicated in<br />

the Table page 1 (where “m” follows simply the chronological order)<br />

<strong>Annex</strong> I <strong>Description</strong> <strong>of</strong> <strong>Work</strong> - page 124 <strong>of</strong> 124

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!