13.11.2012 Views

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4<br />

Installation<br />

4 Installation<br />

i BEFORE<br />

PROCEEDING - ENSURE BOILER IS<br />

CORRECT FOR GAS GROUP SUPPLIED!<br />

The work described in this section must only be carried out<br />

by a competent person.<br />

4.1 Accessories<br />

4.1.1 Controller<br />

To control the <strong>ecoTEC</strong>, <strong>Vaillant</strong> offers various controller versions<br />

for connecting to the switching rail or for plugging<br />

into the operator control screen.<br />

Room Thermostats<br />

VRT 30 – Room Thermostat (230 V)<br />

VRT 50 – Room Thermostat eBUS<br />

Timers / Programmers<br />

timeSWITCH 150 – mechanical clock<br />

timeSWITCH 160 – 7 day <strong>pro</strong>grammer<br />

Digital Room Temperature Controls<br />

VRT 350 – Programmable Room Control<br />

VRT 392f – RF Programmable Room Control *<br />

VRT 350f – RF Programmable Room Control<br />

Weather Compensating Controls<br />

VRC 470 – Weather Compensator<br />

VRC 470f – RF Weather Compensator<br />

Communication<br />

vrnetDIALOG<br />

comDIALOG<br />

Accessories<br />

VR 65 – Control Centre<br />

VR 66 – Control Centre<br />

VR 61/2 – Two Zone Wiring Centre<br />

VR 81/2 – Remote Control Unit<br />

VR 68/2 – Solar Module<br />

4.1 Controller accessories<br />

* Note 392f RF transmitter wired external to boiler<br />

4.1.2 Installation and operation<br />

Optional accessories are available for use in conjunction<br />

with the installation and operation of the <strong>ecoTEC</strong>.<br />

The current price list shows the complete range of hydraulic<br />

accessories for the <strong>ecoTEC</strong> <strong>pro</strong> series.<br />

i The<br />

pipes can be routed upwards behind the<br />

boiler in front of the wall (surface installation)<br />

using the spacer frame. Which means the distance<br />

between the wall and the boiler increases<br />

by 65 mm.<br />

4.2 Scope of delivery<br />

The <strong>Vaillant</strong> <strong>ecoTEC</strong> <strong>pro</strong> is delivered pre-mounted in a packaging<br />

unit.<br />

4.2.1 Unpacking the boiler<br />

> Remove the boiler from its box.<br />

> Remove the <strong>pro</strong>tective film from all parts of the boiler.<br />

4.2.2 Checking the scope of delivery<br />

> Check that all parts have been delivered and are intact<br />

(¬ fig. 4.1 and ¬ table 4.2)<br />

12 Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03<br />

7<br />

6<br />

5<br />

4<br />

4.1 Scope of delivery<br />

1<br />

2<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!