13.11.2012 Views

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4<br />

Installation<br />

4.5 Dimension drawing and connection<br />

measurements<br />

720<br />

A<br />

624<br />

20<br />

35 35<br />

100<br />

440<br />

4.3 Connection measurements in mm<br />

100<br />

Key<br />

1 Wall breakthrough for air/flue gas duct<br />

2 Hanging bracket<br />

3 Heating flow (Æ 22 x 1.5)<br />

4 Hot water connection (Æ 15 x 1.5)<br />

5 Gas connection (Æ 15 x 1.5)<br />

6 Cold water connection (Æ 15 x 1.5)<br />

7 Heating return (Æ 22 x 1.5)<br />

8 Air/flue gas duct connection<br />

9 Condensate trap<br />

10 Condensate discharge connection, Æ 19 mm<br />

11 Heating expansion relief valve drain line connection, Æ 15 mm<br />

Minimum dimension from wall bracket to center<br />

line of air/flue gas duct wall breakthrough<br />

60/100 with elbow 87°, PP 175<br />

80/125 with elbow 87°, PP<br />

4.3 Dimension A for flue pipe wall breakthrough<br />

223<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

Dimension A<br />

[mm]<br />

3 4 5 6 7 11<br />

16 Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03<br />

8<br />

125<br />

9 10<br />

180<br />

125<br />

335

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!