ecoTEC pro - Vaillant
ecoTEC pro - Vaillant
ecoTEC pro - Vaillant
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
10 Commissioning<br />
At the time of commissioning, complete all relevant sections<br />
of the benchmark checklist found within the back<br />
pages of this document.<br />
Ensure that the filling and purging <strong>pro</strong>grams P.06 and P.00<br />
have been allowed to run fully before the boiler is ignited<br />
for the first time.<br />
a<br />
Danger!<br />
Risk of poisoning and burns caused by<br />
escaping hot flue gas!<br />
Hot flue gas can escape and cause poisoning<br />
and burns if the boiler is operated with<br />
an incompletely mounted or open air/flue<br />
gas duct or if the boiler is operated with<br />
internal leaks with the front casing open.<br />
> Operate the boiler<br />
- for commissioning<br />
- for testing purposes<br />
- in continuous operation<br />
only when the front casing is fitted and<br />
closed and the air/flue gas duct is completely<br />
fitted.<br />
> Exclusively for test purposes such as gas<br />
working pressure testing the boiler may<br />
be operated with the front casing<br />
removed for short durations ONLY but<br />
must have a completely mounted air/flue<br />
gas duct.<br />
i The<br />
automatic air vent cap must be released<br />
before filling the heating circuit or recharging<br />
circuit and during operation.<br />
Purge the heating circuit or the recharging circuit<br />
using the purge <strong>pro</strong>gram P.00 (¬ section<br />
10.2).<br />
Auxiliary service equipment:<br />
The following test and measuring equipment is required for<br />
commissioning:<br />
– CO2 measuring instrument<br />
– Digital or U-tube manometer<br />
10.1 Switching on the boiler<br />
> Press the on/off button (¬ Operating instructions).<br />
The basic display appears on the display.<br />
10.2 Using test <strong>pro</strong>grams<br />
You can call up the test <strong>pro</strong>grams for the commissioning<br />
(¬ section 9.2).<br />
Commissioning 10<br />
By activating various test <strong>pro</strong>grams, you can trigger special<br />
functions on the boilers.<br />
The following four test <strong>pro</strong>grams are available:<br />
Display Meaning<br />
P.00 1) Purging test <strong>pro</strong>gram<br />
The heating circuit and the hot water circuit are purged<br />
using the automatic air vent (the cap of the automatic<br />
air vent must be released).<br />
1 x right selection button: Start heating circuit purging<br />
2 x right selection button (" -> "): Start purging<br />
hot water circuit<br />
3 x right selection button (" -> "): Restart heating<br />
circuit purging<br />
1 x left selection button ("Cancel"): Exit purging <strong>pro</strong>gram<br />
The internal pump is cyclically actuated.<br />
Note: The purge <strong>pro</strong>gram runs 7.5 min per circuit.<br />
P.01 Maximum load test <strong>pro</strong>gram:<br />
The boiler is operated at maximum heat input after successful<br />
ignition.<br />
P.02 Minimum load test <strong>pro</strong>gram:<br />
The boiler is operated at minimum heat input after successful<br />
ignition.<br />
P.06 Filling mode test <strong>pro</strong>gram:<br />
The diverter valve (VUV) is moved to the mid-position.<br />
The burner and pump are switched off (to fill or drain<br />
the boiler).<br />
10.1 Overview of the test <strong>pro</strong>grams<br />
1) Purging the heating circuit:<br />
Diverter valve in heating position, actuation of internal pump<br />
for 9 cycles: 30 sec. on, 20 sec. off. Display: "Active heating circuit".<br />
Purging the hot water circuit:<br />
After the above-mentioned cycles have run or the right-hand<br />
selection button has been pressed again: Diverter valve in the<br />
hot water position, actuation of the internal pump as above.<br />
Display: "Active hot water circuit".<br />
i If<br />
you do not press a button for more than<br />
15 minutes. the test <strong>pro</strong>grams are stopped automatically.<br />
The boiler switches to normal operating<br />
mode.<br />
To terminate the test <strong>pro</strong>grams, you can press the left-hand<br />
selection button " " ("Back", "Cancel") at any time.<br />
10.1 Boiler in error condition<br />
P.00<br />
1,0 bar<br />
Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03 31