13.11.2012 Views

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10 Commissioning<br />

At the time of commissioning, complete all relevant sections<br />

of the benchmark checklist found within the back<br />

pages of this document.<br />

Ensure that the filling and purging <strong>pro</strong>grams P.06 and P.00<br />

have been allowed to run fully before the boiler is ignited<br />

for the first time.<br />

a<br />

Danger!<br />

Risk of poisoning and burns caused by<br />

escaping hot flue gas!<br />

Hot flue gas can escape and cause poisoning<br />

and burns if the boiler is operated with<br />

an incompletely mounted or open air/flue<br />

gas duct or if the boiler is operated with<br />

internal leaks with the front casing open.<br />

> Operate the boiler<br />

- for commissioning<br />

- for testing purposes<br />

- in continuous operation<br />

only when the front casing is fitted and<br />

closed and the air/flue gas duct is completely<br />

fitted.<br />

> Exclusively for test purposes such as gas<br />

working pressure testing the boiler may<br />

be operated with the front casing<br />

removed for short durations ONLY but<br />

must have a completely mounted air/flue<br />

gas duct.<br />

i The<br />

automatic air vent cap must be released<br />

before filling the heating circuit or recharging<br />

circuit and during operation.<br />

Purge the heating circuit or the recharging circuit<br />

using the purge <strong>pro</strong>gram P.00 (¬ section<br />

10.2).<br />

Auxiliary service equipment:<br />

The following test and measuring equipment is required for<br />

commissioning:<br />

– CO2 measuring instrument<br />

– Digital or U-tube manometer<br />

10.1 Switching on the boiler<br />

> Press the on/off button (¬ Operating instructions).<br />

The basic display appears on the display.<br />

10.2 Using test <strong>pro</strong>grams<br />

You can call up the test <strong>pro</strong>grams for the commissioning<br />

(¬ section 9.2).<br />

Commissioning 10<br />

By activating various test <strong>pro</strong>grams, you can trigger special<br />

functions on the boilers.<br />

The following four test <strong>pro</strong>grams are available:<br />

Display Meaning<br />

P.00 1) Purging test <strong>pro</strong>gram<br />

The heating circuit and the hot water circuit are purged<br />

using the automatic air vent (the cap of the automatic<br />

air vent must be released).<br />

1 x right selection button: Start heating circuit purging<br />

2 x right selection button (" -> "): Start purging<br />

hot water circuit<br />

3 x right selection button (" -> "): Restart heating<br />

circuit purging<br />

1 x left selection button ("Cancel"): Exit purging <strong>pro</strong>gram<br />

The internal pump is cyclically actuated.<br />

Note: The purge <strong>pro</strong>gram runs 7.5 min per circuit.<br />

P.01 Maximum load test <strong>pro</strong>gram:<br />

The boiler is operated at maximum heat input after successful<br />

ignition.<br />

P.02 Minimum load test <strong>pro</strong>gram:<br />

The boiler is operated at minimum heat input after successful<br />

ignition.<br />

P.06 Filling mode test <strong>pro</strong>gram:<br />

The diverter valve (VUV) is moved to the mid-position.<br />

The burner and pump are switched off (to fill or drain<br />

the boiler).<br />

10.1 Overview of the test <strong>pro</strong>grams<br />

1) Purging the heating circuit:<br />

Diverter valve in heating position, actuation of internal pump<br />

for 9 cycles: 30 sec. on, 20 sec. off. Display: "Active heating circuit".<br />

Purging the hot water circuit:<br />

After the above-mentioned cycles have run or the right-hand<br />

selection button has been pressed again: Diverter valve in the<br />

hot water position, actuation of the internal pump as above.<br />

Display: "Active hot water circuit".<br />

i If<br />

you do not press a button for more than<br />

15 minutes. the test <strong>pro</strong>grams are stopped automatically.<br />

The boiler switches to normal operating<br />

mode.<br />

To terminate the test <strong>pro</strong>grams, you can press the left-hand<br />

selection button " " ("Back", "Cancel") at any time.<br />

10.1 Boiler in error condition<br />

P.00<br />

1,0 bar<br />

Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!