ecoTEC pro - Vaillant
ecoTEC pro - Vaillant
ecoTEC pro - Vaillant
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6.2 Connecting the hot and cold water<br />
6.1 Fitting the hot and cold water connection<br />
4<br />
5<br />
> Make the domestic hot and cold water connections as<br />
shown.<br />
> Ensure correct water pressure and flow requirements<br />
and that any expansion can be accommodated with the<br />
cold supply pipe work (¬ section 2.5.7).<br />
6.3 Connecting the heating flow and heating<br />
return<br />
6.2 Fitting the heating flow and heating return<br />
> Make the water connections as shown.<br />
6<br />
7<br />
5<br />
4<br />
3<br />
1<br />
3<br />
2<br />
2<br />
1<br />
6.4 Low loss header<br />
Hydraulic installation<br />
A low loss header disconnects the boiler from the heating<br />
system. The system is no longer dependent on the remaining<br />
feed head of the boiler. In conjunction with the heating<br />
pump, the low loss header ensures that a sufficiently high<br />
minimum quantity of water is always circulating through<br />
the boiler. No electrical accessories are required in order to<br />
use a low loss header.<br />
6.5 Connecting the condensate discharge<br />
pipework<br />
a Danger!<br />
Risk of death from flue gases!<br />
An empty or insufficiently filled condensate<br />
trap may allow flue gas to escape into the<br />
room air.<br />
> Make sure that the condensate trap is<br />
filled with water when switching on the<br />
boiler.<br />
a Danger!<br />
Risk of death from flue gases!<br />
If the condensate discharge pipework is<br />
connected tightly to a fixed connection to<br />
the waste water piping, the internal condensate<br />
trap can be drained fully.<br />
> Do not connect the condensate discharge<br />
pipework tightly to the waste water<br />
piping.<br />
<strong>ecoTEC</strong> <strong>pro</strong> boilers are equipped with a condensate trap<br />
that continually deposits the contents to the discharge pipe.<br />
Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03 21<br />
4<br />
a<br />
3<br />
Internal<br />
stackpipe<br />
b<br />
3<br />
Internal<br />
discharge system<br />
6.3 Condensate discharge pipework<br />
5<br />
c<br />
6<br />
Gulley<br />
1<br />
2<br />
3<br />
7<br />
d<br />
Soakaway<br />
6