13.11.2012 Views

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11<br />

Adapting the boiler to the heating installation<br />

> Regulate the pressure using the setting screw (1).<br />

Position of the<br />

setting screw<br />

Right-hand stop<br />

(turned all the way<br />

down)<br />

Mid-position (5 turns<br />

to the left)<br />

5 further turns to the<br />

left from the mid-position<br />

Pressure<br />

in MPa<br />

(mbar)<br />

35.0 (350)<br />

Notes/application<br />

If the radiators do not get<br />

<strong>pro</strong>perly hot in the default<br />

setting.<br />

Note: In this case, you must<br />

set the pump to the maximum<br />

stage.<br />

25.0 (250) Factory setting<br />

17.0 (170)<br />

If noises in the radiators or<br />

radiator valves are <strong>pro</strong>duced<br />

11.4 Setting value for the by-pass valve (feed head)<br />

11.2 Handing over the boiler to the operator<br />

a<br />

Danger!<br />

Risk of poisoning and burns caused by<br />

escaping hot flue gas!<br />

Hot flue gas can escape and cause poisoning<br />

and burns if the boiler is operated with<br />

an incompletely mounted or open air/flue<br />

gas duct or if the boiler is operated with<br />

internal leaks with the front casing open.<br />

> Operate the boiler<br />

- for commissioning<br />

- for testing purposes<br />

- in continuous operation<br />

only when the front casing is fitted and<br />

closed and the air/flue gas duct is completely<br />

fitted.<br />

> Exclusively for test purposes such as gas<br />

working pressure testing the boiler may<br />

be operated with the front casing<br />

removed for short durations ONLY but<br />

must have a completely mounted air/flue<br />

gas duct.<br />

> After completing the installation, stick the 835593<br />

sticker in the user's language to the front of the boiler.<br />

The sticker is delivered with the boiler.<br />

You must brief the operator of the boiler on the handling<br />

and function of the <strong>ecoTEC</strong> <strong>pro</strong>.<br />

> Explain the importance of regular maintenance by a<br />

competent skilled trade company to the operator.<br />

It is strongly recommended that a maintenance contract<br />

be taken out to ensure regular maintenance. Important<br />

information is available from <strong>Vaillant</strong> Service Solutions<br />

(0870 6060 777).<br />

> Complete the benchmark Benchmark gas boiler commissioning<br />

checklist which is found at the end of these<br />

instructions.<br />

If this boiler is not installed and commissioned in accordance<br />

with the manufacturer's instructions, this may void<br />

the guarantee (Note: Your legal rights remain unaffected<br />

by this.)<br />

> Handover the boiler to the operator.<br />

> Explain the basic operation of the heating installation to<br />

the operator.<br />

> Provide the operator with all relevant instructions and<br />

boiler documentation.<br />

> Go through the operating instructions with the operator<br />

> Reply to his questions if necessary.<br />

> Make the operator aware of the need to keep the instructions<br />

in a handy location near the boiler, but not in or on<br />

the boiler.<br />

> Draw special attention to the safety instructions, which<br />

the operator must follow.<br />

> Instruct the operator that no changes or adaptations<br />

must be made to the flue system or combustion air supply.<br />

These must both terminate outside of the building<br />

and be constructed only from ap<strong>pro</strong>ved components.<br />

> Explain to the operator how he should monitor the water<br />

level/filling pressure of the system.<br />

> Explain to the operator which measures are required to<br />

top up and purge the heating installation if required.<br />

> Explain to the operator how to correctly set the temperatures,<br />

the controllers and the thermostatic radiator<br />

valves (economically).<br />

> Complete and sign off the Benchmark commissioning<br />

check list.<br />

> Complete and sign off the guarantee documentation.<br />

44 Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!