13.11.2012 Views

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

ecoTEC pro - Vaillant

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ensure safe lifting techniques are used - keep back<br />

straight – bend using legs - when lifting load from floor<br />

level.<br />

> Do not twist – reposition feet instead.<br />

> Keep boiler as close as possible to body throughout lift<br />

to minimise strain on back.<br />

> Always use assistance if required.<br />

> Recommend wear suitable cut resistant gloves with good<br />

grip to <strong>pro</strong>tect against sharp edges and ensure good grip<br />

when handling appliance.<br />

> It is recommended a risk assessment of the roof<br />

space area be carried out before moving the appliance<br />

into the area to take into account access, stability of<br />

flooring, lighting and other factors, and ap<strong>pro</strong>priate<br />

measures taken.<br />

4.4 Requirements for the installation site<br />

4.4.1 Required minimum clearances/<br />

installation clearances<br />

> When using accessories, observe the minimum clearances/installation<br />

clearances (¬ fig. 4.2).<br />

C<br />

A<br />

B<br />

4.2 Recommended minimum clearances/installation clearances<br />

Key<br />

A 165 mm (air/flue gas duct Æ 60/100 mm)<br />

246 mm (air/flue gas duct Æ 80/125 mm)<br />

B 180 mm<br />

C 5 mm; optimum ap<strong>pro</strong>x. 50 mm<br />

500 mm in front of the boiler to enable easy access for<br />

servicing (may be <strong>pro</strong>vided by an opening door).<br />

Clearance at the side is not required, but the side panels<br />

can also be removed if there is adequate side clearance (at<br />

C<br />

Installation<br />

least ap<strong>pro</strong>x. 50 mm) in order to facilitate maintenance or<br />

repair work (¬ section 4.8).<br />

It is not necessary to ensure sufficient clearance between<br />

the boiler and combustible materials or components as the<br />

temperature of the boiler will always be less than the maximum<br />

permissible temperature of 85 °C due to its nominal<br />

heat output.<br />

4.4.2 Using installation templates<br />

An installation template is supplied with the boiler to aid<br />

wall mounting.<br />

The template shows the following:<br />

– The position of the fixing holes for the hanging bracket.<br />

– The position of the connections.<br />

– The position of the wall breakthrough of the air/flue gas<br />

duct.<br />

Position the installation template vertically over the installation<br />

site.<br />

> Attach the template to the wall, using tacks for example.<br />

> Mark the drill holes for the hanging bracket on the wall.<br />

> If necessary, mark the position for the wall breakthrough<br />

for the air/flue gas duct.<br />

> Remove the installation template from the wall.<br />

> Drill 2 holes Æ 10 mm for the hanging bracket in the wall.<br />

> If necessary, cut the wall breakthrough for the air/flue<br />

gas duct.<br />

Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03 15<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!