Ensure safe lifting techniques are used - keep back<br />
straight – bend using legs - when lifting load from floor<br />
level.<br />
> Do not twist – reposition feet instead.<br />
> Keep boiler as close as possible to body throughout lift<br />
to minimise strain on back.<br />
> Always use assistance if required.<br />
> Recommend wear suitable cut resistant gloves with good<br />
grip to <strong>pro</strong>tect against sharp edges and ensure good grip<br />
when handling appliance.<br />
> It is recommended a risk assessment of the roof<br />
space area be carried out before moving the appliance<br />
into the area to take into account access, stability of<br />
flooring, lighting and other factors, and ap<strong>pro</strong>priate<br />
measures taken.<br />
4.4 Requirements for the installation site<br />
4.4.1 Required minimum clearances/<br />
installation clearances<br />
> When using accessories, observe the minimum clearances/installation<br />
clearances (¬ fig. 4.2).<br />
C<br />
A<br />
B<br />
4.2 Recommended minimum clearances/installation clearances<br />
Key<br />
A 165 mm (air/flue gas duct Æ 60/100 mm)<br />
246 mm (air/flue gas duct Æ 80/125 mm)<br />
B 180 mm<br />
C 5 mm; optimum ap<strong>pro</strong>x. 50 mm<br />
500 mm in front of the boiler to enable easy access for<br />
servicing (may be <strong>pro</strong>vided by an opening door).<br />
Clearance at the side is not required, but the side panels<br />
can also be removed if there is adequate side clearance (at<br />
C<br />
Installation<br />
least ap<strong>pro</strong>x. 50 mm) in order to facilitate maintenance or<br />
repair work (¬ section 4.8).<br />
It is not necessary to ensure sufficient clearance between<br />
the boiler and combustible materials or components as the<br />
temperature of the boiler will always be less than the maximum<br />
permissible temperature of 85 °C due to its nominal<br />
heat output.<br />
4.4.2 Using installation templates<br />
An installation template is supplied with the boiler to aid<br />
wall mounting.<br />
The template shows the following:<br />
– The position of the fixing holes for the hanging bracket.<br />
– The position of the connections.<br />
– The position of the wall breakthrough of the air/flue gas<br />
duct.<br />
Position the installation template vertically over the installation<br />
site.<br />
> Attach the template to the wall, using tacks for example.<br />
> Mark the drill holes for the hanging bracket on the wall.<br />
> If necessary, mark the position for the wall breakthrough<br />
for the air/flue gas duct.<br />
> Remove the installation template from the wall.<br />
> Drill 2 holes Æ 10 mm for the hanging bracket in the wall.<br />
> If necessary, cut the wall breakthrough for the air/flue<br />
gas duct.<br />
Installation and maintenance instructions <strong>ecoTEC</strong> <strong>pro</strong> 0020129672_03 15<br />