27.01.2015 Views

+ 1970 News Releases (7.6 Mb PDF file) - NASA

+ 1970 News Releases (7.6 Mb PDF file) - NASA

+ 1970 News Releases (7.6 Mb PDF file) - NASA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Add 2<br />

MCC internal validation testing includes integrating the RTCC_<br />

CCATS (cormaunications, co_m_md and telemetry system), display systems,<br />

and the Apollo simulavors at Kennedy Space Center in Florida. The<br />

Apollo simulators in Houston were tied-in and validated earlier<br />

to facilitate flight controller proficiency sims which began early<br />

in<br />

September.<br />

Other tests to be conducted prior to the mission include interface<br />

with the Apollo Launch Data System (ALDS) which is t_e telemetry system<br />

at KSC. This is scheduled for sometime next week.<br />

The MCC/Launch Pad interface test with the Goddard Space Flight<br />

Center MILA Unified S-Band (USB) station is scheduled early in<br />

December. This will be fol3owed by the launch vehicle redundancy<br />

tests and the flight readiness test (FRT).<br />

Two days of testing in the middle of January of next year will<br />

be required for the MCC/Net_rork Validation. This testing will be<br />

completed three days prior to the CDDT (Countdo_m demonstration tests)<br />

at KSC. These tests will consist of running eommunications_ command<br />

telemetry_ air/ground_ and tracking tests with each station on the<br />

MSFN (Manned Space Flight Network). When this is completed the entire<br />

data system will be ready to support the Apollo 14 mission.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!