A-6. 2004-2015 Transportation Facilities Plan Project List continued<br />
TFP # CIP # Project Location Project Description Source Capacity Pre- Project 2004-2015<br />
Plan* Project Design Cost Costs<br />
Only ($000) ($000)<br />
<strong>Mobility</strong> Management Area #9 - East <strong>Bellevue</strong> (continued)<br />
Implementation <strong>of</strong> a package <strong>of</strong><br />
145th Place SE/SE 8th primarily walkway/bikeway projects PB/<br />
Street to SE 24th Street in the West Lake Hills area <strong>of</strong> EBTP/<br />
TFP-160 NIS-1 AND SE 22nd Street/145th <strong>Bellevue</strong>. These projects were WLH-NIS 6,500 4,500<br />
Place to 156th Avenue SE identified through a coordinated<br />
AND 156th Avenue/ Neighborhood Investment Strategy<br />
NE 6th Street to SE 24th process led by the Department <strong>of</strong><br />
Street<br />
Planning and Community<br />
Development.<br />
Add 2nd eastbound and westbound<br />
TFP-168 NE 8th Street at 148th left turn lanes on NE 8th Street. 148th<br />
Avenue SE All widening would be done to the MIP X 2,389 2,389<br />
north side <strong>of</strong> the roadway.<br />
SE 34th Street/164th Pl Widen curb lanes; sidewalk on north<br />
TFP-175 SE to West Lake side; consider signalization <strong>of</strong> PB X 150 150<br />
Sammamish Pkwy intersection with West Lake<br />
Sammamish Parkway.<br />
SE 26th Street/SE 24th<br />
TFP-178 to West Lake Sammamish Bike lanes; sidewalk both sides. PB X 150 150<br />
Pkwy<br />
Lengthen the westbound left turn<br />
lane from Lake Hills Blvd to 148th<br />
Avenue SE from 75 feet to approximately<br />
250 feet and/or convert the<br />
TFP-188 I-90 148th Avenue SE at existing thru/right turn lane to a CIP X 540 540<br />
Lake Hills Boulevard left/thru/right turn lane. Construct<br />
new sidewalks where missing on the<br />
north side and reconstruct sidewalks<br />
on the south side <strong>of</strong> Lake Hills Blvd<br />
to the east <strong>of</strong> 148th Avenue SE, and<br />
implement pedestrian crossing and<br />
signal improvements.<br />
<strong>Mobility</strong> Management Area #10 - Eastgate<br />
Widen 150th Ave SE to seven lanes<br />
from SE 36th to SE 38th Sts, add a<br />
TFP-011 R-105 150th Ave SE - SE 36th sidewalk on the west side from SE CIP X 5,659 3,854<br />
St to Newport Wy 36th St to Newport Way, add turn<br />
lanes at the intersection <strong>of</strong> 150th<br />
and Newport Way; add U-turn pocket<br />
on SE 36th St west <strong>of</strong> Allen Rd.<br />
<strong>2005</strong> <strong>State</strong> <strong>of</strong> <strong>Mobility</strong> <strong>Report</strong> Appendix 105