28.01.2015 Views

2005 State of Mobility Report - City of Bellevue

2005 State of Mobility Report - City of Bellevue

2005 State of Mobility Report - City of Bellevue

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX<br />

A-6. 2004-2015 Transportation Facilities Plan Project List continued<br />

TFP # CIP # Project Location Project Description Source Capacity Pre- Project 2004-2015<br />

Plan* Project Design Cost Costs<br />

Only ($000) ($000)<br />

<strong>Mobility</strong> Management Area #10 - Eastgate (continued)<br />

Add one southbound lane on 148th<br />

Avenue SE from the merge lane at<br />

SE 24th Street to the westbound I-90<br />

on ramp. The first interior southbound<br />

lane will provide access to<br />

TFP-038 R-117 148th Avenue SE/SE 24th both 148th Avenue SE and the I-90 CIP X 5,483 2,436<br />

Street to SE 28th Street westbound on ramp. Signal phasing<br />

and turn restrictions will control<br />

turning movements at Landerholm<br />

Circle and the intersection <strong>of</strong> 148th<br />

Avenue SE at SE 28th Street, the fourth<br />

leg <strong>of</strong> which will also be completed.<br />

Pedestrian and bicycle facilities will<br />

be enhanced.<br />

Complete missing sections <strong>of</strong> sidewalk<br />

TFP-076 Eastgate Way/Richards on north side <strong>of</strong> Eastgate Way; bicycle PB/EBTP 1,400 1,400<br />

Road to 148th Avenue SE lanes both sides, and bus rider waiting<br />

areas on south side; add turn pockets<br />

where necessary.<br />

Widen by extending the third south-<br />

148th/150th Avenue SE/ bound lane (currently funded as part<br />

TFP-154 I-90 westbound on-ramp to <strong>of</strong> PW-R-117) from the ramp to west- E/I-90 X 1,600 1,600<br />

I-90 westbound <strong>of</strong>f-ramp bound I-90 to south <strong>of</strong> Eastgate Way<br />

at the I-90 westbound <strong>of</strong>f ramp.<br />

156th Avenue SE at SE Widen the I-90 westbound <strong>of</strong>f-ramp to<br />

TFP-162 Eastgate Way (I-90 provide two dedicated left turn lanes E/I-90 X 410 410<br />

westbound <strong>of</strong>f-ramp) and a shared through/right lane with<br />

a channelized right turn.<br />

Complete the missing Mountains to<br />

Sound Greenway trail segment across<br />

the BCC campus. Construct a 10’<br />

BCC Campus Trail/148th wide trail from the end <strong>of</strong> the existing<br />

TFP-169 Avenue SE to 142nd Place trail from 142nd Place SE to SE 32nd E/I-90 400 400<br />

SE<br />

Street. Widen the existing 6’ paved<br />

trail along the north side <strong>of</strong> Coal<br />

Creek Road to 10’ from Landerholm<br />

Circle to the “N” building on the<br />

campus.<br />

Complete the missing Mountains to<br />

TFP-179 161st Place SE/SE 35th Sound Greenway trail segment by<br />

Place to 148th Avenue SE constructing a 10’ wide multi-purpose E/I-90 2,830 2,830<br />

trail through Boeing to the Eastgate<br />

Trail trailhead.<br />

Widen sidewalk through the tunnel to<br />

become an 8-9’ wide multi-purpose<br />

TFP-181 Reconfigure SE 35th Place trail with a crash barrier separating E/I-90 720 720<br />

Tunnel at I-90<br />

the trail from the roadway. Install<br />

improved lighting along the length<br />

<strong>of</strong> the tunnel.<br />

106<br />

<strong>2005</strong> <strong>State</strong> <strong>of</strong> <strong>Mobility</strong> <strong>Report</strong> Appendix

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!