2005 State of Mobility Report - City of Bellevue
2005 State of Mobility Report - City of Bellevue
2005 State of Mobility Report - City of Bellevue
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
List <strong>of</strong> Tables and Charts<br />
2-A. 2004 Daily Trip Demand To and From <strong>Bellevue</strong> 14<br />
2-B. 2030 Daily Trip Demand To and From <strong>Bellevue</strong> 15<br />
2-C. I-405 Corridor Program 16<br />
2-D. I-90 Two-Way Transit/HOV Project 17<br />
2-E. SR 520 Bridge Replacement and HOV Project 17<br />
2-F. Nickel Package and TPA Projects 18<br />
3-C. Range <strong>of</strong> Volume-to-capacity Ratios with User Impressions 24<br />
3-D. 2000-2004 Areawide Level <strong>of</strong> Service Performance 25<br />
3-E. Concurrency Areawide Average Levels <strong>of</strong> Service 27<br />
4-A. Project Planning: From Policy to Financial Programming 29<br />
4-C. Comparison <strong>of</strong> 2001-2012 TFP and 2004-2015 TFP 33<br />
4-D. Transportation Funding as a Portion <strong>of</strong> Total CIP Budget, 1998-2011 34<br />
4-E. Sources <strong>of</strong> Funding in the <strong>2005</strong>-2011 CIP 35<br />
5-A. Main Components <strong>of</strong> the CIP Project Selection Process 39<br />
5-B. Comparison <strong>of</strong> Actual CIP spending to Adopted and Total Budget Available, 2001-<strong>2005</strong> 41<br />
5-C. Completed CIP Projects, <strong>2005</strong> 42<br />
6-A. Neighborhood Traffic Calming Program Requests, 2001-<strong>2005</strong> 45<br />
6-B. Implemented NTCP Phase I Measures, 2001-<strong>2005</strong> 47<br />
6-C. Implemented NTCP Phase II Measures, 2001-<strong>2005</strong> 47<br />
6-D. Neighborhood Traffic Calming Projects and Outcomes 48<br />
6-F. Transportation NEP Requests and Project Information, 2001-<strong>2005</strong> 50<br />
6-G. Neighborhood Enhancement Program Transportation Projects, <strong>2005</strong> 51<br />
6-H. Radar Sign Effectiveness 52<br />
7-A. Police Investigated Traffic Accidents, 2001-<strong>2005</strong> 55<br />
7-C. Highest Accident Intersections, <strong>2005</strong> 56<br />
7-D. Highest Accident Mid-Block Corridors, <strong>2005</strong> 57<br />
7-E. Completed Accident Reduction Program Projects, <strong>2005</strong> 58<br />
7-G. Completed Spot Improvement Projects, <strong>2005</strong> 60<br />
8-A. Street Repair Priority by Functional Class and Pavement Rating 63<br />
8-B. Roadways Meeting Pavement Rating Standards, 2001-<strong>2005</strong> 64<br />
8-C. Pavement Performance Curve 64<br />
8-E. <strong>City</strong>-Maintained Bridge Structures 66<br />
9-A. Transit Improvement Targets 72<br />
10-A. Completed Pedestrian system Projects, <strong>2005</strong> 78<br />
10-C. Pedestrian System Completion by <strong>Mobility</strong> Management Area 80<br />
11-A. Completed Bicycle System Projects, <strong>2005</strong> 83<br />
11-C. Bicycle Route Classification 85<br />
11-D. Bicycle System Completion by <strong>Mobility</strong> Management Area 86<br />
A-3. Regional <strong>Mobility</strong> Interest <strong>State</strong>ment 95<br />
A-5. Level <strong>of</strong> Service (PM peak, 2-hour Average) 98<br />
A-6. 2004-2015 Transportation Facilities Plan Project List 102<br />
A-9. Annual Accident Study – Intersections, <strong>2005</strong> 112<br />
A-10. Annual Accident Study – Mid-Block Corridors, <strong>2005</strong> 113<br />
A-11. Cost Savings to the Public from Accident Reduction Projects, 1990-<strong>2005</strong> 114<br />
124<br />
<strong>2005</strong> <strong>State</strong> <strong>of</strong> <strong>Mobility</strong> <strong>Report</strong>