E - Iccat
E - Iccat
E - Iccat
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3 rd WG FUTURE OF ICCAT – MADRID 2012<br />
Commission, as has been done in other RFMOs. While ICCAT has taken interim steps in this regard, the fullest<br />
and most appropriate treatment can only be accomplished through Convention amendment. The WCPFC<br />
Convention, the Antigua Convention, the SPRFMO Convention, and the new North Pacific Fisheries<br />
Commission Convention contain provisions that address the participation of non-Parties and provide helpful<br />
guidance on this matter.<br />
Monitoring, Control, and Surveillance (MCS). Effective MCS programs are critical for ensuring that<br />
management measures can be well implemented. While ICCAT has adopted a variety of MCS measures through<br />
recommendation, the MCS provisions of the ICCAT Convention specified in Article IX are somewhat limited<br />
and do not fully reflect concepts contained in more modern instruments. Enhancing this aspect of the Convention<br />
by establishing clear and modern MCS mandates would provide ICCAT with the strongest foundation possible<br />
to ensure compliance with its rules.<br />
The United States will be considering if there are additional contributions we might make to facilitate the<br />
Working Group on the Future of ICCAT at its May meeting. In support of this, we encourage CPCs to contact us<br />
in advance of that meeting to share their views on issues raised herein and any other matters to be considered by<br />
the Working Group. The United States anticipates that a key outcome of the May meeting will be clear<br />
agreement on ways and means for bringing the ICCAT Convention and other basic texts in line with modern<br />
fisheries management approaches and current international legal norms.<br />
Notes to the Working Group on the Future of ICCAT<br />
Concerning Agenda Item 4.G – Strengthening the SCRS<br />
(Submitted by the SCRS Chair)<br />
Appendix 5 to ANNEX 4.2<br />
During the 2011 Commission meeting in Istanbul, reaffirming the necessity that any conservation and<br />
management measure is based on the best possible scientific advice, the Commission adopted the Resolution by<br />
ICCAT on Best Available Science [Res. 11-17]. The Commission recognizes the high quality work of the SCRS<br />
and, with this Resolution, intends to reinforce the role of the Committee.<br />
The SCRS Working Group on Stock Assessment Methods (Madrid, 16-20 April 2012) analyzed the implications<br />
of this Resolution and the main outcomes are summarized below:<br />
− Quality control and validation of stock assessment software used by SCRS. The SCRS has a protocol for<br />
software validation and quality control in place, the ICCAT software catalogue. The Working Group<br />
agreed to continue collaborating with other initiatives, like the Strategic Initiative on Stock Assessment<br />
Methods (SISAM) and to explore the possibility of the ICCAT software catalogue becoming part of a<br />
worldwide repository of stock assessment methods.<br />
− Transparency. On the issue of the transparency of the work of the SCRS, it was indicated that the<br />
Performance Review of ICCAT considered the SCRS work to be highly transparent. The Group<br />
recognized the importance of taken steps towards maintaining and even improving the transparency of the<br />
work of the SCRS.<br />
− Code of conduct. The Group acknowledged that currently the SCRS does not have a code of conduct for<br />
scientists and observers attending its meetings and, therefore, it recommended that such a code of conduct<br />
be drafted to comply with the requirements of [Res. 11-17].<br />
− Peer reviews. The Group was reminded that peer reviews of the work of SCRS Working Groups have<br />
already been conducted in the past and that a protocol to conduct such reviews is already in place.<br />
It was agreed that the current protocol for peer review of the SCRS work should be revised and updated.<br />
The Group also agreed that the Secretariat should prepare and keep a list of experts who have been agreed<br />
to participate in the peer review process and who have been judged to have the necessary experience and<br />
expertise to perform that task. This will allow the selection of external experts as soon as the SCRS<br />
calendar of assessment meetings has been approved by the Commission.<br />
121